Topic | Recent |
---|---|
Recycled Content & FSC Certified Wood Credits Grey AreaNC-2009 MRc7: Certified Woodposted by Roberto Meza on Jul 29, 2011, 5:47 pm
We have the following case: We bought several door with the following characteristics according to the cut sheet:... Last reply: Lauren Sparandara, Apr 18, 2013, 1:42 pm |
|
IEQp1- Occupant diversityNC-2009 IEQp1: Minimum indoor air quality performanceposted by susan eguia on Apr 27, 2012, 2:14 pm
Hi, We have existing Library project with combined multiple zone and single zone. We used the V4.0 form as per requirement during initial review, however, our IEQp1 has been denied with... Last reply: Manny Iglesia, May 7, 2012, 6:04 pm |
|
electrical room/swimming pools coolingNC-2009 EAp2: Minimum Energy Performanceposted by Tarek Dalati on Jun 4, 2012, 2:15 am
is the electrical rooms and internal swimming pools cooling is considered as a process load or not? regards Last reply: Erin Adkins, Jun 4, 2012, 10:51 am |
|
Excluding Soil Brought in from Off-siteNC-2009 MRc4: Recycled Contentposted by Margaret McColl on Oct 12, 2012, 11:36 am
Hello, I'm working on a project where a very large amount of the soil had to be removed due to contamination (we are pursuing SSc3) and clean soil had to be brought in from off-site. The... Last reply: Tim Crowley, Nov 27, 2012, 8:34 am |
|
System fan power- BaselineNC-2009 EAp2: Minimum Energy Performanceposted by Luana Bertoletti on Oct 16, 2012, 10:41 am
Hi, I have a doubt related to the system fan power calculation described in section G.1.2.9. Last reply: Marcus Sheffer, Feb 11, 2013, 10:34 am |
|
LEED Interpretation: get recycled content figures by plantNC-2009 MRc4: Recycled Contentposted by Tristan Roberts on Oct 31, 2012, 10:06 am
LEED Interpretation #10246, out on 10/1/12, makes a pretty big change to documentation requirements for MRc4 (effective for... Last reply: Tristan Roberts, Jan 30, 2013, 12:02 pm |
|
ISO 140001 CertificationNC-2009 IDc1: Innovation in Designposted by kathy zarsky on Nov 27, 2012, 6:45 pm
Has anyone had any success in receiving an innovation credit point for this with LEED version 2009? Last reply: Anna Foden, Dec 18, 2020, 12:28 pm |
|
CxA contracting for enhanced commissioning in a design&build proNC-2009 EAc3: Enhanced Commissioningposted by Valentin Grimaud on Nov 29, 2012, 7:38 pm
Dear All, We have a 300,000sqft project, quite technical facility. It is a design&build contract and the owner is reluctant on taking independent contracts on his own. In... Last reply: Scott Bowman, Jul 18, 2013, 12:38 pm |
|
guestrooms keycard: power adjustment for automatic lighting ctrlNC-2009 EAc1: Optimize Energy Performanceposted by Habitech Distretto Tecnologico Trentino on Feb 27, 2013, 8:57 am
This project is a hotel: guestrooms are provided with keycards, so when guestrooms are not occupied all lighting fixtures are automatically shut-off. Can credits be taken in the proposed case for... Last reply: Marcus Sheffer, Mar 21, 2018, 2:39 pm |
|
Choose the right one?NC-2009 EAc1: Optimize Energy Performanceposted by Robert Sutton on Apr 30, 2013, 2:09 pm
Determine the interior lighting power allowance by Last reply: Robert Sutton, Apr 30, 2013, 10:18 pm |