Paired bus route serviceNC-v4 LTc5: Access to quality transitposted by Francis McNulty on Apr 22, 2016, 5:09 am
Hi, Is it necessary for both stops to be within 400m of the site in order to satisfy the paired route requirements? There are a considerable number of one-way streets adjacent to our site... Last reply: Kimberly Schlaepfer, May 5, 2016, 6:56 pm |
|
Open Space: FenceNC-v4 SSc3: Open spaceposted by Sophie Brauer on Apr 19, 2016, 8:42 am
Hello, Last reply: Trista Brown, May 2, 2016, 11:49 am |
|
ISO 50001 ACP TimeframeEBOM-2009 EAp1: Energy efficiency best management practices - planning, documentation and opportunity assessmentposted by Gina Dederer on Apr 5, 2016, 6:23 am
Our project has completed a full ISO 50001 certification last year and is not due for a renewal until 2018. The ACP for the ISO 50001 certification states that the certification had to be... Last reply: Dave Hubka, Apr 26, 2016, 8:40 am |
|
Service hot water pumps in the baselineNC-2009 EAp2: Minimum Energy Performanceposted by Jordan Kirrane on Apr 14, 2016, 12:03 pm
I am doing an ASHRAE 90.1-2007 PRM analysis. We have a DOAS CV laboratory design. Our proposed service hot water (... Last reply: Marcus Sheffer, Apr 25, 2016, 2:29 pm |
|
Paints or sealants applied before building is sealedCS-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Francis McNulty on Jan 28, 2016, 10:10 am
Hi, If paints /... Last reply: Tristan Roberts, Apr 22, 2016, 5:42 pm |
|
Reuse of window glass for contstruction fillCS-2009 MRc2: Construction Waste Managementposted by Maria Glädt on Apr 15, 2016, 6:12 am
We're involved in a Project where the Contractor wants to send the window glass to a facility that crushes the glass. The crushed glass material can after this be used as construction fill for... Last reply: RETIRED, Apr 15, 2016, 9:02 am |
|
Discrepancy between credit requirements and credit specificsPilot-Credits MRpc52: Material multi-attribute assessmentposted by Jody Lee Potvin-Jones on May 21, 2015, 7:43 am
I'm having a hard time understanding why it is necessary to document cost, weight and "percentage of product contributing to this criterion", if the requirements are simply to use 20 different... Last reply: Chloe Bendistis, Apr 13, 2016, 5:14 pm |
|
Mastersite scorecard Construction ReviewLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Susannah Goddard on Apr 12, 2016, 9:37 am
My project is a Campus project. All of the credits sought on the Mastersite scorecard are "Awarded" after Final Design Review (and appeal in some cases). What do I do now? Do I still need to... Last reply: Susannah Goddard, Apr 13, 2016, 10:13 am |
|
Separating waste- reuse at householdCI-2009 MRc2: Construction Waste Managementposted by Maria Glädt on Apr 7, 2016, 8:08 am
We have a project where there for example lighting fittings, some doors etc. that would be possible to... Last reply: RETIRED, Apr 7, 2016, 3:28 pm |
|
Suburban achieving SSc2NC-2009 SSc5.2: Site development - maximize open spaceposted by Martin Meehan on Mar 31, 2016, 8:32 am
The credit language states that projects in Urban areas achieving SSc2 can contribute with green roof/pedestrian oriented hardscape. Are projects in Suburban areas achieving SSc2 allowed... Last reply: Saurabh Shrestha, Apr 6, 2016, 10:07 pm |