Topic | Recent |
---|---|
Applicability within campus boundary limitsNC-v4 SSp1: Construction Activity Pollution Preventionposted by Samer Alhmdan on Jul 25, 2017, 2:59 am
Hello, Last reply: Trista Brown, Jul 25, 2017, 6:47 pm |
|
Waste ReceiptsNC-2009 MRc2: Construction Waste Managementposted by Rashed Al Nasa'a on Jul 13, 2017, 8:29 am
The contractor on our project has established a weighing station for trucks and vehicles within the project boundary and is planning to use it to measure the amount of diverted waste for MRc2.... Last reply: RETIRED, Jul 17, 2017, 11:34 am |
|
Proposed case outside airflow ratesNC-2009 EAp2: Minimum Energy Performanceposted by Cagril Comert on Jul 11, 2017, 11:08 amMarcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5903 thumbs up July 11, 2017- 11:54 am How you model this could vary depending on the software you are using. In some software you need to create a dummy zone. For software specific questions usually the best place to try is either customer support (if it exists) or one of the discussion groups. There are several at onebuilding.org and http://energy-models.com/forum Log in or register to post comments ... Last reply: Marcus Sheffer, Jul 11, 2017, 11:54 am |
|
100% certified woodNC-2009 IDc1: Innovation in Designposted by Abdulla Anwar on Jun 1, 2017, 3:16 am
Dears, Last reply: Kath Williams, Jul 5, 2017, 3:00 pm |
|
How can I develop leed certificate service in my country?NC-v4 EQp1: Minimum indoor air quality performanceposted by erdem özkan on Jun 21, 2017, 3:10 am
We provide Leed certificate and green building service but how are we developing this process in Turkey? |
|
VRV in Table 1.4CS-2009 EAp2: Minimum Energy Performanceposted by Maya Karkour on Jun 19, 2017, 3:51 am
Hello, I am filling out the Table 1.4 for an office building with mutiple tenants, and each tenant has a separate VRV to serve their space. On the "General HVAC" tab of Table 1.4 (... Last reply: Marcus Sheffer, Jun 19, 2017, 9:37 am |
|
Exterior lighting for group certificationNC-2009 SSc8: Light Pollution Reductionposted by Mohamed M. Abd Elhameed on Mar 27, 2017, 6:19 pm
I am currently working on a project with multiple buildings within the LEED boundary. The project will follow group approach registration via campus guidance. Up to my understanding exterior... Last reply: Bill Swanson, Jun 12, 2017, 11:13 am |
|
LEED Group C&S- Applicable Cooling source in Propose caseCS-v4 EAp2: Minimum Energy Performanceposted by Ashraf Ali Khan Khan on Jun 8, 2017, 8:13 am
I am modelling for LEED GROUP - v4 BD+C: CS. Project has 40 Office buildings shared with same basement and served with multiple Water Cooled Chillers as cooling source. For LEED Group... Last reply: Marcus Sheffer, Jun 9, 2017, 9:06 am |
|
Applicable Cooling source in Propose case- LEED Group- v4 C&SCS-2009 EAp2: Minimum Energy Performanceposted by Ashraf Ali Khan Khan on Jun 8, 2017, 7:29 am
I am modelling for LEED GROUP - v4 BD+C: CS. Project has 40 Office buildings shared with same basement and served with multiple Water Cooled Chillers as cooling source. For LEED Group... Last reply: Marcus Sheffer, Jun 9, 2017, 9:06 am |
|
Estimating the energy cost share of PVNC-2009 EAc2: On-Site Renewable Energyposted by Mohamed M. Abd Elhameed on Jun 6, 2017, 4:45 am
I am working on an industrial LEED project in KSA. Most of electrical loads are for the industrial processes itself (i.e production line), while the other remaining loads are for HVAC and... Last reply: Marcus Sheffer, Jun 6, 2017, 11:58 am |