Topic | Recent |
---|---|
Does an entire warehouse have to be heated to qualify for LEED EBOMWarehouses-EBOM-v4 EAp2: Minimum Energy Performanceposted by Ralph Bicknese on Feb 22, 2024, 3:30 pm
I did not receive any replies on my previous post so I am restating the issue. To meet... |
|
Serious(ly) Newb Question: ASHRAE 90.1,LEED v4.1 Discussion Forumposted by on Feb 25, 2024, 1:41 am
Hi Folks, I am the poor slob (AKA apprentice) tasked with sorting out the credit our local electrical utility will allow for a lighting project of a commercial bldg outside parking lot.... |
|
How outdoor water is calculated for green walls (vertical vegetations)?NC-v4 WEp1: Outdoor water use reductionposted by Leo LeQuoc on Feb 25, 2024, 6:24 pm
Our team is working with a new construction project where design team wants to apply green walls (vertical vegetations) outside the building facade. As LEED calculator only defines vegetation on... |
|
One-time air testing: how to enter readings in the ARC platformEBOM-v4.1 EQp4: Indoor Environmental Quality Performanceposted by jimmy Adames on Feb 26, 2024, 1:35 pm
Greetings, I have a few questions regarding this credit.
|
|
LEED V4.1 O&M Precertification denied.LEED v4.1 Discussion Forumposted by shashank gangil on Feb 26, 2024, 10:32 pm
Dear, I recently enrolled a project on LEED online for LEED V4.1 O&M. We are going for Pre-Certification First. For Pre-certification of LEED v4.1 O&M, we need to fill a... |
|
Conflict of InterestNC-v4 EAc1: Enhanced Commissioningposted by Hameed Jasir on Mar 3, 2024, 2:22 am
Good morning.! The owner hired ICA company for design and construction. Would it be acceptable for the contractor to hire the same company for LEED construction stage credit compliance and... |
|
Partial Floor LEED CertificationCI-v4 MPR3: Must comply with project size requirementsposted by Edgar Arevalo on Mar 7, 2024, 12:14 am
I have a project that is a partial floor fit-out where the client would like that partial space to be LEED certified. The project space is approximately 52% - 60% of the total floor area, but it... |
|
Lighting Control in blood draw spacesHealthcare-v4 EQc6: Interior lightingposted by Heather Belsey on Mar 11, 2024, 3:56 pm
For the lighting credit you need to have individual controls at 90% of patient positions. LEED defines patient positions as: A patient bed, infusion chair, recovery... |
|
Pilot credit RequirementPilot-Credits SSpc55: Bird collision deterrenceposted by on Mar 12, 2024, 1:05 pm
Commenting to comply with credit requirements. Credit language is clear and the team was able to implement without trouble. The project used a highly reflective glazing to comply. |
|
TRUE Waste Certification Advisor RecommendationEBOM-v4.1 MRp3: Waste Performanceposted by Daniel Bertschinger on Mar 13, 2024, 3:32 pm
Hello Everyone! |