What "floor area" to use

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Lyle Axelarris on Aug 26, 2015, 9:10 pm

Since the credit template is not linked to the Gross Floor area in PIf2 (as it is in other relevant credits), does that mean the floor area in the flushout calcs should be net area, as it is done...

Last reply: Dave Hubka, Oct 8, 2015, 5:15 pm

Testing with multiple systems in one space

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Nate Steeber on Jul 29, 2015, 1:16 pm

I've looked deeply into all the comments here, but I can't seem to find an answer - I apologize if this is a repeat, or too simple of a question:

My project has many AHUs, in some cases...

Last reply: Dylan Connelly, Oct 8, 2015, 4:40 pm

Bike Rack?

EBOM-2009 MRc2: Sustainable Purchasing—Durable Goods
posted by Michelle Bracewell-Musson on Oct 7, 2015, 12:22 pm

Hello,

I have read to Reference Guide EMOB 2009 and cannot decide if a bike rack that will be permanently installed on the exterior of the building would comply here? I would hope as it...

Last reply: Michelle Bracewell-Musson, Oct 7, 2015, 2:28 pm

calibration parameters

NC-2009 EAc5: Measurement and Verification
posted by Edward Niemczycki on Oct 5, 2015, 3:48 pm

We have nearly completed a LEED Silver project and they are still asking for simulation calibration procedures, calibration parameters, frequency of measurement and calibration accuracy for the...

Last reply: Christopher Schaffner, Oct 6, 2015, 11:48 am

Outpatient clinic

CI-2009 WEp1: Water Use Reduction
posted by Chris Miller on Oct 6, 2015, 9:10 am

Just received comments back in regards to fixtures, how come LEED does not allow exam room sinks to be included in the calculations for an...

Last reply: Chris Miller, Oct 6, 2015, 10:23 am

ASHRAE Advanced Energy Design Guide- Option 2

NC-v4 EAc2: Optimize Energy Performance
posted by Aaron Wascher on Oct 5, 2015, 4:52 pm

Does anyone know if this applies to new construction only or do renovated spaces need to be upgraded to meet this? My project is 17% new/83% renovation. Since there are no calculations, the...

Last reply: Marcus Sheffer, Oct 5, 2015, 6:00 pm

Phasing Multiple LEED Projects

Healthcare-v2009 MPR3: Must use a reasonable site boundary
posted by Sara Zoumbaris on Oct 2, 2015, 12:30 pm

We are working on a development where the project site is composed of two adjacent parcels of land. There are four-buildings total on this site (3 new and 1 a major renovation) that are pursuing...

Solar Tubes in Energy Pro

NC-2009 EAp2: Minimum Energy Performance
posted by Logan Dorrell on Oct 1, 2015, 12:30 pm

How would we model a solar tube light fixture in Energy Pro Software? We want to get the light thru it, but not the heat. Can we just make it a skylight with really good thermal properties or...

Last reply: Marcus Sheffer, Oct 1, 2015, 12:43 pm

Amphitheater Occupancy for SS and WE

General forums
posted by Peter Doo on Sep 30, 2015, 1:50 pm

Amphitheater Occupancy

Project Location: United States
Our project is the back stage area of a seasonal outdoor amphitheater concert venue. The venue hosts concerts 35 days per year...

Gym sinks- Private or Public?

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by Kathryn West on Oct 30, 2014, 2:07 pm

has anyone ever successfully argued that sinks in gym locker rooms are more akin to "private" fixtures? Folks do all sorts of things other than wash their hands in there. I've seen people brush...

Last reply: Johanna Hendricks, Sep 30, 2015, 12:15 am