Log in
Forum
Topic

Ergonomist Design Phase Involvement

Pilot-Credits EQpc44: Ergonomics approach for computer users
posted by Marissa Hebert on Dec 6, 2016, 6:40 pm

This may be an obvious answer, but it seems a little vague to me. The credit contains the following language:

During the conceptual or schematic design phases:
1. Engage an...

LEED Lab Mexico

Pilot-Credits IPpc96: LEED Lab
posted by David Dominguez on Feb 8, 2017, 4:55 am

We are wrapping up our second semester and finishing our performance period, we expect soon to have the first building in Mexico certified under a LEED-Lab. We are so happy and we would like to...

pilot closure

Pilot-Credits MRpc76: Material ingredient reporting
posted by Batya Metalitz on Mar 2, 2017, 11:14 am

Based on MR...

moving to innovation catalog on 3/15/2017

Pilot-Credits MRpc61: Material disclosure and assessment
posted by Batya Metalitz on Mar 2, 2017, 11:18 am

Based on MR...

moving to innovation catalog on 3/15/2017

Pilot-Credits MRpc77: Material ingredient optimization
posted by Batya Metalitz on Mar 2, 2017, 11:19 am

Based on MR...

moving to innovation catalog on 3/15/2017

Pilot-Credits MRpc79: Material ingredients product manufacturer supply chain optimization
posted by Batya Metalitz on Mar 2, 2017, 11:19 am

Based on MR...

ESVE Requirement

Pilot-Credits LTpc70: Green vehicles
posted by Joshua Chia on Mar 17, 2017, 3:43 am

Hi, hope someone can help clarify whether the requirement for the ESVE to be capable of participating in a demand-response program or...

Access to at least 50% of tenant occupant floors

Pilot-Credits EQpc78: Design for active occupants
posted by Christopher Heine on Apr 19, 2017, 10:03 am

The credit language states "Buildings must have at least one main stair that enables occupants to travel between the building entrance floor(s), occupant’s own destination floor and common use...

UCSB- Bren Hall

Pilot-Credits IPpc96: LEED Lab
posted by Brandon Kaysen on Apr 19, 2017, 5:13 pm

We are very excited to be wrapping up our third LEED Lab project at UCSB. This ear we are certifying the iconic Bren Hall under Version 4 of the EBO&M rating system. This year we've had 40...

Appying the requirements in a High Rise

Pilot-Credits EQpc78: Design for active occupants
posted by Donald Green on May 18, 2017, 1:21 pm

I saw a couple comments about applying the requirements of this Pilot Credit in a building other than 2 to 3 stories. The following are questions and comments.

I am curious how it works in...