Topic | Recent |
---|---|
BD+C vs ID+C Rating System SelectionRetail-CI-v4 MPR2: Must use reasonable LEED boundariesposted by Sofia Barahona on Jan 5, 2022, 4:21 pm
We are working on a Retail (fast food store) that is currently in the LEED registration process. We are confused with the selection of the rating system because we were originally treating it as... |
|
Access to Quality Transit: Functional entry of the project in a MallRetail-CI-v4 LTc3: Access to quality transitposted by herminia gammarano on Mar 7, 2022, 5:02 am
Hello LEED community, My question is regarding to the requirement of the credit Access to Quality transit, It said to locate any fuctional entry of the project within 1/4... |
|
DES- VRF mixed Proposed systemRetail-CI-v4 EAc2: Optimize Energy Performanceposted by Lorenzo Giannetti on Feb 12, 2024, 5:47 am
Hi all, I am working on a project where, regarding the heating part of the proposed design, the... |
|
Medical Equipment SpecificationHealthcare-v4 WEp2: Indoor water use reductionposted by Gabriela Crespo on Mar 14, 2017, 1:40 pm
Dear all, We're working on a HC project in Mexico, but we seem to be having trouble complying with what is required for process equipment in table 5 of this pre-req. Would somebody be... |
|
Paired routes within walking distanceHealthcare-v4 LTc5: Access to quality transitposted by Donal Dignan on Dec 21, 2017, 1:02 pm
There is a bus route I would like to count for this credit: the stop in one direction is within the 400 metre... |
|
Copper Use for MRc6Healthcare-v4 MRc6: PBT source reduction - lead, cadmium and copperposted by Vikram Kanade on Jan 9, 2018, 12:54 am
Hi, we are only using copper piping in a healthcare application for medical gas supply. No copper is being used for water supply that comes to human contact anywhere in the project. Is... |
|
DocumentationHealthcare-v4 IPp1: Integrative project planning and designposted by Tarik Tadmori on Jan 25, 2018, 7:47 am
O.k. So we just held our workshop for a project. How is this documented at the design submission stage? Report of topics covererd and key actions/ownership? |
|
use open space outside of project areaHealthcare-v4 SSc3: Open spaceposted by Lene Hill on Mar 9, 2018, 4:42 pm
We have a project (building and parking lot) being built in a small master planned community. The community has several open spaces natural areas adjacent to the project with walking trails. ... |
|
Vegetated roofs for Places of Respite CreditHealthcare-v4 SSc7: Places of respiteposted by María Fernanda Aguirre on Apr 7, 2018, 6:43 pm
Hello everyone: There is a huge hospital in Chile which is in design phase and wants to pursue LEED. The building has not enough space at the ground level but considers a large amount of... |
|
Enhanced Indoor Air Flows in Spaces under ASHRAE 170 clasificationHealthcare-v4 EQc1: Enhanced indoor air quality strategiesposted by Jose Antonio Kovacevic on Apr 11, 2018, 3:21 pm
Hello, I am assessing the indoor airflow needs of an hospital pursuing credit EQc1, option 2. I was wondering if the exigence of EQc1 option 2 to increase flow rate by 30% in all occupied... |