Topic | Recent |
---|---|
Open spaces- Turf Grass CalculationSchools-NC-v4 SSc3: Open spaceposted by Michael J Turner on Jun 2, 2022, 12:39 pm
Hi There, Is Turf grass included in the calculations as vegetated open space? We have a school project. It is LEED V4.0 and we are going with V4.1 for this credit. Many thanks ... |
|
New Wall Project- LEED ApplicabilityLEED Rating System Selectionposted by Amgad Khattab on Jun 5, 2022, 1:02 am
Is it applicable for a historic wall project to obtain LEED New Construction BD+C Certification? The project consist of constructing a new wall (10 Km) with multiple entry gates. Every... |
|
exemplary performanceTipsheet Forumposted by Amin ELEL on Jun 6, 2022, 2:01 pm
Hello everyone As im studying for LEED AP exam , i've got an almost basic question which is a little bit confusing to me. how can we really earn points for exemplary performance? i know... |
|
Do off-street parking facilities that are not surface-parking require carpool or car-sharing parkingND-Plan-v4 NPDc5: Reduced parking footprintposted by Pongpitch J. on Jun 8, 2022, 12:38 am
Hi, Our project does not have any surface parking (outdoor lots or single-story parking facilities not under habitable buildings). The project does not have any existing parking facilities... |
|
Not enough parking space within a 60-meter range of the entrances to fit all preferred parkingND-Plan-v4 NPDc5: Reduced parking footprintposted by Pongpitch J. on Jun 8, 2022, 12:41 am
Hi, The project plans to provide 10% carpool and shared-use vehicle parking; however, only some of the preferred parking can fit into the available lots within a 60-meter range of... |
|
Water test locationEBOM-v4 WEc3: Cooling tower water useposted by Clive Lacey on Aug 16, 2022, 2:01 pm
Water test for Cooling tower should be done on site? We have the water test result from the two reservior which are so far from the project site (about 70-80 km). However these reservior... |
|
Innovation- PILOT- ergonomics approach for computer usersNC-v4 INc1: Innovationposted by Anina Mbilinyi on Aug 16, 2022, 5:35 pm
I registered EQpc44 on March 4, 2021 with V4.0 project. The documents are complete and went to LEED Online to finalize documentation and the pilot credit was gone from the form. I researched and... |
|
Prefabricated or modular structure BuildingsNC-v4 MPR1: Must be in a permanent location on existing landposted by VISHAL JAIN on Aug 17, 2022, 8:53 am
Hello, Would like to know more details on how "Prefabricated or modular... |
|
# of Bird collisions vs. LocationWarehouses-NC-v4.1 INc1: Innovationposted by Angela Nekoranik on Aug 17, 2022, 10:38 am
Hi all! I was curious to know if the impact of this credit has been recorded / if location of the building plays a role. Is there an obvious difference based on location/proximity of building to... |
|
Air Scrubbers for Construction Indoor Air Quality Management Plan, LEED v4 ID +C: CICI-v4 EQc3: Construction indoor air quality management planposted by Tricia M on Aug 17, 2022, 2:51 pm
Hi all, Do we know if for this credit, based off the credit guidelines on the credit library (... |