Industrial NormalizationEBOM-v4 EAp2: Minimum Energy Performanceposted by Aqrab Ali Rana on Aug 5, 2016, 3:38 am
. |
|
Heat Island ReductionEBOM-v4 SSc3: Heat Island Reductionposted by VISHESH AGARWAL on Aug 20, 2016, 7:59 am
Dear All, Can I take option-2: Roof (1 Points) and option-4: Parking Under Cover (1 Points) Simultaneously for achieving 2 points under this category OR we need to use option-3 for... |
|
Approved DeicersEBOM-v4 SSc5: Site managementposted by Stephanie Donovan on Oct 14, 2016, 3:38 pm
Hi Sam, I've been looking at deicers appropriate for this credit. After some chemicals were removed from the environmentally friendly list in the reference guide via the July addenda, I... |
|
Number of cyclesEBOM-v4 WEc3: Cooling tower water useposted by Jonathan Miller on Feb 18, 2014, 11:03 pm
What is the number of cycles necessary to achieve 1 point? 10? |
|
100% well or non-potable waterEBOM-v4 WEc3: Cooling tower water useposted by Elizabeth Dunn on Nov 14, 2016, 12:29 am
Our building uses 100% well or non-potable water. We are pulling the water analysis but even if we aren't meeting the fullest number of cycles, we aren't using any water from the municipal source... |
|
Light Pollution ReductionEBOM-v4 SSc4: Light Pollution Reductionposted by Patricia Andrasik on Mar 30, 2015, 11:28 pm
How does one calculate... |
|
Parking Garage considered Exterior Fixtures?EBOM-v4 SSc4: Light Pollution Reductionposted by Rachel Shepherd on May 5, 2015, 10:42 am
I am currently working on a project that has a covered, above ground parking garage within the site boundary. Are the fixtures within the parking garage considered interior or exterior fixtures... |
|
sum of mean lamp lumensEBOM-v4 SSc4: Light Pollution Reductionposted by VISHESH AGARWAL on Aug 6, 2016, 3:55 am
Light Pollution Reduction |
|
Is my project elegible to apply for Case 1EBOM-v4 EAp2: Minimum Energy Performanceposted by Ana Paula Quiros on Sep 6, 2017, 1:31 pm
Hi, I'm working on a project located outside the U.S. and more than 50% of the project is classified as office. I entered all the information into Portfolio Manager and the project... |
|
How to conduct Cost-Benefit AnalysisEBOM-v4 EAc7: Renewable energy and carbon offsetsposted by Hamzeh Saqer on Mar 29, 2018, 12:28 am
I just need to know how to conduct the cost-benefit analysis (step 6) for a PV array on-site owned by a third party. So it is basically purchasing... |