Furniture and Medical Furnishing (product sourced-160Km)Healthcare-v4.1 MRc7: Furniture and medical furnishingsposted by Maria Kordjamshidi on Apr 6, 2022, 3:29 pm
I am woundring if the product sourced is not in 160 km of the project, no point will be assigned to the project from MRC7? |
|
Use of Supplemental fans for Building flush outNC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by John Covello on Apr 7, 2022, 4:14 pm
Hello, Our contractor wants to use supplemental industrial floor fans to shorten the flush out time for a project. They are not sure how the fans are placed and used for the flush... |
|
Lighting control for hotel lobby, bar, restaurantHospitality-NC-v4 EQc6: Interior lightingposted by Giuseppina Amorusi on Apr 8, 2022, 6:41 am
Good morning I have a question relating lighting control in a hotel building. The protocol require to have , For all shared multioccupant spaces, multizone control systems that... |
|
Determination of existing parkingHospitality-NC-v4.1 LTc7: Reduced parking footprintposted by Francesco Lupoi on Apr 11, 2022, 7:32 am
Hi everyone! I'm working on Reduced Parking Footprint credit for a new construction hotel. Underground parking have been planned, should I consider them in the calculation? Or I need... |
|
Sustainability Consultant I- Group14 Engineering- Denver, COHelp Wanted: LEED-related Jobsposted by Laura Charlier on Apr 19, 2022, 5:13 pm
Opening Our Sustainability Team is looking for a motivated and creative sustainability consultant with a minimum of 2 years of experience in commercial building design or... |
|
Natural ventilation: what output from CFD model we need to show LEED for compliances?NC-v4 EQp1: Minimum indoor air quality performanceposted by Michael on Apr 20, 2022, 12:22 am
Hi LEED experts, my project is a warehouse, they use natural ventilation through a double side louver. However, the distance between louvers is > 5 times of Ceiling height, which doesn't... |
|
ventilation in unheated and uncooled spacesNC-v4 EQp1: Minimum indoor air quality performanceposted by Francesco Passerini on Apr 21, 2022, 7:22 am
I have doubts relative to the correct intepretation of ASHRAE 62.1 for unheated and uncooled spaces. The text of ASHRAE is: 6.4 Natural Ventilation Procedure. Natural... |
|
Additional requirement for O+M projectsPilot-Credits SSpc129: Comprehensive Compostingposted by Trista Brown on Apr 21, 2022, 7:28 pm
Does anyone find the additional requirements for O+M projects unnecessary? I'm not sure why a waste stream study is required for O+M when both options already specifically require that teams "... |
|
LOCALIZATION OF STORAGE AND COLLECTION OF RECYCLABLESHospitality-NC-v4 MRp1: Storage and Collection of Recyclablesposted by Andrea gamio on Apr 25, 2022, 11:57 am
Well, my answers is about the better location of the dumpsters. Our project is a boutique hotel in the historic neigtboardhood town of spain, and the building is smaller. I can´t find in the... |
|
All-Gender Restrooms- Verticality (Locate on all levels or selected levels?)NC-v4 INc1: Innovationposted by Vijitha Mammen on Apr 25, 2022, 3:49 pm
We are working on a post-secondary education project incorporating both gendered and all-gender restrooms. We are trying to understand if we can pursue the All-Gender Restrooms ... |