Log in
Forum
Topic

Donating appliances to charity- ID credit?

NC-v4 INc1: Innovation
posted by Tad Radzinski on Mar 8, 2022, 3:12 pm

Our project will be built instead of an older building that has been demolished - the appliances of that building are being documented and donated to a local charity. Can these donations be used ...

LEED Green Building Consulting position

Help Wanted: LEED-related Jobs
posted by Martha Norbeck on Mar 8, 2022, 4:51 pm

C-Wise is looking for a person with experience in design and construction who is passionate about addressing climate change through initiatives in the built environment. This position offers the...

Comparison between the three systems BREEAM, DNGB LEED

LEED Rating System Selection
posted by Wisam Maddni on Mar 9, 2022, 4:03 am

Dear ladies and gentlemen,

I would like to ask this question: Are there currently properties that have several certification systems (...

How to calculate co-drivers in vehicle or motorbike that another one is driving.

EBOM-v4 LTc1: Alternative Transportation
posted by MAGDALINI AL-FANTEL on Mar 9, 2022, 10:32 am

Hello,

In the frame of LTc1 - Alternative transportation we have conducted a survey in order to see how the regular occupants commute to and from the project premises. As one of the...

Strategies 3 and 4- Filtration of Outdoor / Recirculated Air

NC-v4.1 EQc1: Enhanced indoor air quality strategies
posted by Pooja Sannamani on Mar 9, 2022, 4:39 pm

Can both Strategy 3. Filtration of Outdoor Air and Strategy 4. Filtration of Recirculated Air be achieved together where the ventilation system mixes outdoor air with recirculated air and meets...

How does Open Space play a role in the 1: 1.5 ratio?

ND-Plan-v4 NPDp1: Walkable Streets
posted by Jennifer Turchin on Mar 10, 2022, 1:06 pm

If at least 40% of the block length of the circulation network within the project has to have a minimum building height-to-street centerline ratio of 1:1.5 how does open space play into this...

Shower and Change Facility Requirements for Commercial space in a Multi-Unit Residential Building

NC-v4 LTc6: Bicycle facilities
posted by Mercedes Byers on Mar 10, 2022, 3:56 pm

Hi,

I have a question regarding the shower and change facility requirements. My project is targeting LEED v4 but is pursuing the v4.1 credit subsitute for Bicycle Facilities. The beta...

difference between the two versions of option 1 listed

Schools-NC-v4 SSc8: Joint Use of Facilities
posted by Anthony Stark on Mar 11, 2022, 10:31 am

There are 2 Option 1 descriptions listed in the credit language.  The first one allows for fees to be charged for use of space inthe school building, the second version states use of the facility...

Green Building Systems Analyst

Help Wanted: LEED-related Jobs
posted by Michelle Rosenberger on Mar 11, 2022, 2:23 pm

ArchEcology, LLC is a small, women-owned Sustainability Consulting Business in Seattle, WA looking for an experienced Green Building Systems Analyst.

This...

LEED v4.1 EB O&M: How can data center projects overcome the constraints of the Arc energy score?

EBOM-v4.1 EAp3: Energy Performance
posted by JL on Mar 14, 2022, 5:25 pm

For LEED v4.1 EB O&M projects, I understand that Energy Performance scores are assigned in the Arc platform by considering a building's floor area, occupancy, and operating hours. And that...