Log in
Forum » United States
Topic

Fluorescent Light Tubes and Donation of Equipment

CI-2009 MRc2: Construction Waste Management
posted by Joseph Sneed on Dec 3, 2014, 9:43 am

Michelle R LEEDuser Expert 625 thumbs up December 3, 2014- 10:37 am Joseph- All fluorescent lamps contain mercury- http://www.ecy.wa.gov/mercury/mercury_light_bulbs.html. I have always treated their proper disposal via recycling to be hazardous waste for the purposes of LEED. Please refer to this discussion on the LEED-NC v2009 forum for a more detailed discussion- http://www.leeduser.com/credit/NC-2009/MRc2?all-comments=true#comment-11501. Here is a link to the EPA about businesses and mercury-containing lamps- http://www.epa.gov/osw/hazard/wastetypes/universal/lamps/index.htm. Please also refer to the Should I include hazardous...

Last reply: RETIRED, Dec 3, 2014, 10:37 am

Column Veneer preserved but covered

NC-2009 MRc2: Construction Waste Management
posted by Madhura Dhayagude on Dec 2, 2014, 2:12 pm

We are working on a project where the client wants to preserve the existing column veneer, however they want to cover the whole column with a new finish. Would this case be applicable in...

Last reply: RETIRED, Dec 2, 2014, 2:46 pm

Ability to make a design final submission

General forums
posted by Madhura Dhayagude on Dec 2, 2014, 12:10 pm

I am a part of this project which was registered 3 years ago with Initial review submitted. The project got delayed due to legal hassles and after 3 years has now been passed from the original...

NPDc11: are townhomes single dwelling or multiunit buildings

ND-v2009 NPDc11: Visitability and universal design
posted by Megan Shelby on Dec 1, 2014, 3:53 pm

For NPDc11 Visitability and Universal Design, are townhomes considered single dwelling unit buildings or multiunit buildings?

Last reply: Eliot Allen, Dec 1, 2014, 11:31 pm

Any HAP Expert?

NC-2009 EAp2: Minimum Energy Performance
posted by Khaled Fouda on Dec 1, 2014, 11:11 am

Marcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5601 thumbs up December 1, 2014- 11:20 am A HAP subscription comes with customer service included so you can call/email them directly. There is also a HAP Users discussion forum at onebuilding.org. If it is for a heating only space model a system 9 or 10 from ASHRAE 90.1-2010 which is allowed via addendum dn. Another way way to deal with the no heating/no cooling system situation is to set the temperatures in the spaces so that the system never comes on in the first place. There are ways around the situation of not having...

Last reply: Marcus Sheffer, Dec 1, 2014, 11:20 am

initial cost for lease

CI-2009 EAc3: Measurement and Verification
posted by Monica Hue on Nov 26, 2014, 12:18 pm

Is there are is an initial fee that must be paid upfront when the tenant signs the lease to pay for energy use? If there is this fee, how much does that typically cost?

Last reply: Marcus Sheffer, Nov 28, 2014, 4:42 pm

LEED ND v3 Examination End Date

General forums
posted by Michael McElroy on Nov 24, 2014, 10:24 am

FSC certified shop

NC-2009 MRc7: Certified Wood
posted by Marc Perry on Nov 10, 2014, 4:09 pm

Does a cabinet fabricator need to be a "...

Last reply: RETIRED, Nov 22, 2014, 2:30 pm

Showers in group projects

NC-2009 SSc4.2: Alternative transportation - bicycle storage and changing rooms
posted by Stacey Olson on Nov 21, 2014, 1:36 pm

This piggy-backs to my previous comment about bike rack locations.

Per the published Campus/Group Eligibility Credits & Prerequisites for LEED 2009, SSc4.2 - Alternative Transportation...

MPR 6 for Single Tenant Building

CI-2009 PIf1: Minimum Program Requirements
posted by Jonathan Weiss on Nov 21, 2014, 11:24 am

Tristan Roberts Technical Director HPDC LEEDuser Expert 11436 thumbs up November 21, 2014- 12:24 pm Jonathan, can you post this to our MPR6 forum? Thanks. Log in or register to post comments ...

Last reply: Tristan Roberts, Nov 21, 2014, 12:24 pm