Office Building + warehouse + Production Floor

NC-2009 EAp2:Minimum Energy Performance
posted by  Jackson .  on 

Hi all, We have a project back in climate zone 1 and in the struggling to understand energy modeling for such building combination.

3
Mon Oct 22, 2012, 2:16 pm

Buildings Connected by Maintenance Tunnel

LEED Guidance for Campuses and Multiple Buildings
posted by  Dave Wortman  on 

I am working on a project where two buildings directly adjacent to each other but separated by 10-20 feet are being designed to be connected by an underground tunnel.

3
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1360 thumbs up
Sun Oct 21, 2012, 3:41 am

Densely occupied spaces exemption

EBOM-2009 IEQc1.2:IAQ Best Management Practices—Outdoor Air Delivery Monitoring
posted by  Katherine Ann Resurreccion  on 

Hi All, We have a project that has a lot of meeting rooms (area of each room is smaller than 150 square feet) that can accomodate 4 person per meeting room - therefore considered densely occupied

3
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Fri Oct 19, 2012, 7:58 pm

ENERGY COST BUDGET METHOD, ENVELOPE

CI-2009 EAp2:Minimum Energy Performance
posted by  TOMAS URIBE  on 

Greetings. I am working on a Commercial interior project pursuing the EAP2, and I chose the section 11 as an alternative to prescriptive approach, but, i am a little bit confused about how to sim

5
Default Avatar
PROJECT MANAGER
SOLUCIONES ENERGETICAS SOSTENIBLES
LEEDuser Basic Member
7 thumbs up
Fri Oct 19, 2012, 7:48 pm

Concept Designers as CxA?

CS-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Ward Miller  on 

The project in question is a design and build project for which the general contractor will be assigned the project's design and construction activities; however, there is an architectural and engi

12
Chief Environmental Officer
Alpenglow Advisory
LEEDuser Basic Member
44 thumbs up
Fri Oct 19, 2012, 3:33 pm

Can AE-1 be CxA?

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  ANNE JURAN  on 

We prepared the RFP (or bridging documents) for a design-build project.

4
Director of Commissioning & Critical System
Edwards & Zuck
LEEDuser Basic Member
29 thumbs up
Thu Oct 18, 2012, 9:29 pm

Compliance?

CI-2009 EAp2:Minimum Energy Performance
posted by  Alex AC  on 

Hi LEEDuser community, I have read some old posts regarding this issue, but I still want to double check with you guys. I hope you don´t mind.

3
Default Avatar
LEEDuser Basic Member
5 thumbs up
Thu Oct 18, 2012, 9:11 pm

DES: virtual rate and efficiency

CS-2009 EAp2:Minimum Energy Performance
posted by  FABIO VIERO  on 

Hello all, according to the document “Treatment of District or Campus Thermal Energy in LEED V2 and LEED 2009 – Design & Construction”, for Option1: Virtual District Hot Water Rate [$/MBTU] =

3
Head of Sustainability
Manens S.p.A.
LEEDuser Premium Member
16 thumbs up
Thu Oct 18, 2012, 7:08 pm

single stream recycling

EBOM-2009 MRc6:Solid Waste Management—Waste Stream Audit
posted by  Courtney Royal  on 

Our project is located in Ithaca, NY and curbside recycling pickup has moved into a single stream recycling collection.

3
Default Avatar
Owner / Energy Engineer / Sustainability Consultant
Sustainnovations, LLC
LEEDuser Basic Member
94 thumbs up
Thu Oct 18, 2012, 6:41 pm

Green Roof modeling for EAc1

NC-2009 EAc1:Optimize Energy Performance
posted by  Kalyan Nishtala  on 

Hi All, I am modeling a 350,000 sqft dormitory/dining hall located in NY. Part of the roof of this building green roof (approximately 10%).

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4452 thumbs up
Thu Oct 18, 2012, 5:55 pm