
Forum quick links
Can one comment on LEED-ND SLLc3: Access to Quality Transit?
posted by Eric Orozco on
Based on two previous discussions elsewhere on this forum, I've recently become aware of a facet of SLL Credit 3 that may be harmful to transit service outcomes, and I am wondering if there is an o
Weather data
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by SENGATHIR SELVAN on
Hello there, I have an issue with EPA energy star portfolio, not sure whether I can address in this forum. My project is in Dhaka,Bangladesh & it is a factory building.
10 Point Maximum?
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Caroline O'Leary on
We are utilizing LEED v2009 Retail NC for a major remodel/addition for a bank branch.
Interior Renovations and Non-Contiguous Parcels as Part of LPB
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Brooks Critchfield on
We have a very large existing facility registered under LEED-CI which will be partially renovated and partially updated.
CI and District Heating and Cooling
CI-2009 IDc1:Innovation in Designposted by Sue Barnett on
My project is on a Campus that has used a District Heating and Cooling System and has achieved LEED ID credit in the past. They want me to use this as an ID credit for our CI project.
Recycled Content of Steel from Multiple Suppliers
NC-2009 MRc4:Recycled Contentposted by Jerry Reeves on
This is directly from the preliminary review report: 1. Bull Moose Tubing has been reported with a recycled content of 62.5% post-consumer and 37.5% pre-consumer.
PSZ-HP system and preheat coils
NC-2009 EAc1:Optimize Energy Performanceposted by Francesco Passerini on
In the proposed design an AHU is connected to a lot of zones. In that AHU there is a preheat coil. I have to model the baseline model as system 4 PSZ-HP.
CI Review Fee
NC-2009 MPR4:Must comply with minimum floor area requirementsposted by Jorge Lopez de Obeso on
We saw the CI Fees table and, since it caused so much impression about having a such small CI Retail and paying the same that a 50000sf project... we just want to make sure that this is it...