Log in
Forum
Topic

Meters on closed-loop hydronic system makeup water

Healthcare-v4 WEc4: Water metering
posted by Mark Benson on Apr 26, 2023, 12:24 pm

Many healthcare projects have closed-loop hydronic systems for chilled water and heating hot water.  Would providing separate meters for chilled water make-up and hot water make-up count as two...

Meter on Domestic hot water vs. Cold-water makeup for domestic hot water systems

Healthcare-v4 WEc4: Water metering
posted by Mark Benson on Apr 26, 2023, 12:32 pm

Can someone explain the difference between a meter measuring domestic hot water consumption and a meter measuring cold-water makeup for domestic hot water systems?  The first meter can be used...

Inpatient Visitors using Inpatient Restrooms- How to Calculate

Healthcare-v4 WEp2: Indoor water use reduction
posted by Heather Ane Zeto on Apr 27, 2023, 1:17 pm

I may be overthinking this - but hopeful someone can chime in with project/review experience!  We are working on a new hospital.  I understand that the LEED Reference Guide clearly states that...

Shuttle bus service (in the large campus) can claim a part of quality transit?

Healthcare-v4 LTc5: Access to quality transit
posted by Pongpitch J. on May 19, 2023, 7:40 am

In case of LEED-NC, The Building in the large campus site, provide shuttle bus service at a pickup point1 to other major transit facilities outside at pickup point2 (gate entrance). If the...

Interpreting "medical intervention" and "direct medical care"

Healthcare-v4 SSc7: Places of respite
posted by on Sep 1, 2023, 10:44 am

We are working on a Mental Health facility and we are curiosus about how to interpert "medical intervention" and "direct medical care: "The area is located where no medical intervention...

Lighting Control in blood draw spaces

Healthcare-v4 EQc6: Interior lighting
posted by Heather Belsey on Mar 11, 2024, 3:56 pm

For the lighting credit you need to have individual controls at 90% of patient positions.  LEED defines patient positions as:

A patient bed, infusion chair, recovery...

Rating system

Hospitality-NC-v4 MPR2: Must use reasonable LEED boundaries
posted by Ana Paula Quiros on Oct 30, 2017, 1:21 pm

Hello, we are working on project that is a house and each of its rooms will be rented as hotel/airbnb and we want to know it LEED Hospitality is the correct system to certify ir. 

Many...

LEED Hospitality and occupancy calculation

Hospitality-NC-v4 MPR2: Must use reasonable LEED boundaries
posted by Ricardo Sá on Nov 17, 2017, 12:19 pm

I'm starting a LEED Certification of a building that will be used to accommodate students, comprising of 220 individual rooms that are to be fully occupied between September and July (occupancy...

Venturi-type flow-through vacuum generators or aspirators

Hospitality-NC-v4 WEp2: Indoor water use reduction
posted by Dionisio Franca on Aug 31, 2018, 2:33 am

Hi! What are the common uses of "venturi-type flow-through vacuum generators or aspirators"?

number of testing locations in a hotel with factory-produced modular rooms

Hospitality-NC-v4 EQc4: Indoor air quality assessment
posted by Gail Napell on Mar 31, 2019, 12:11 pm

Hi all

we plan to do Option 2 in a hotel with factory-produced modular rooms. ...