plaster

NC-v4 WEc3: Cooling tower water use
posted by Sue Bryant on Aug 17, 2020, 4:39 pm

Soil testing to document restoration

NC-v4 SSc2: Site development - protect or restore habitat
posted by Beth Johannessen on Aug 18, 2020, 10:46 am

Is a soil test needed both before and AFTER construction to show that soil has been restored? We are tyring to understand how to document the restoration of the soil. We completed soil tests...

Minimum Requirement for Bicycle Facilities Credit

NC-v4 LTc6: Bicycle facilities
posted by Nuttanee Vongveeranonchai on Aug 25, 2020, 7:30 am

Dear All, 

I have a question regarding the minimum requirement of the Bicycle facilities credit. Our project is a conference center located in the center of Bangkok, Thailand....

CLASS 1 AIR SEPERATION DISTANCES_62.1 2010

NC-v4 EQp1: Minimum indoor air quality performance
posted by Fotis Kotsopoulos on Aug 25, 2020, 12:24 pm

In case of a central...

MRp2/c5-- Can we count shipping dunnage returned to precast manufacturer as material reuse?

NC-v4 MRp2: Construction and demolition waste management planning
posted by Terry Thornsbury on Aug 26, 2020, 1:52 pm

We have a large (800,000sf) project that is being constructed primarily using precast floor decks and architectural wall panels. Delivery of these components involves many flatbed trailers using...

Future Deveopment Affecting Open Space

NC-v4 SSc3: Open space
posted by Hashir Usman on Sep 1, 2020, 9:19 am

Greetings everybody,

We have a campus project. There are different phases of construction in the same campus boundary. We are working on the current phase lets say Phase A, and it has...

Radon resistant construction for first 4 stories above grade.

NC-v4 EQp1: Minimum indoor air quality performance
posted by Sue Bryant on Sep 15, 2020, 8:09 pm

  • Requirement: Construct any dwelling unit on levels one through four above grade with radon-resistant construction techniques. Follow the techniques prescribed in EPA Building Radon Out;...

EAc6

NC-v4 EAc6: Enhanced Refrigerant Management
posted by Anna Kaelin on Sep 18, 2020, 2:59 pm

Hello,

I am working on a New Construction project - a community center, certifying under LEED v4. 

I am pretty new with LEED projects and trying to identify whether the HVAC systems...

Savings higher than 100% achieve 2 points?

NC-v4 WEc1: Outdoor water use reduction
posted by Ricardo Sá on Sep 22, 2020, 4:25 am

Dear All,

 
we’re currently working on a project of a new airport facility that intends to be LEED Certified. In what relates with outdoor water use reduction credit, our preliminary...

Lighting controls inside a dorm restroom

NC-v4 EAp2: Minimum Energy Performance
posted by Waleed AlGhamdi on Sep 22, 2020, 11:26 am

Section 9.4.1.2 Space Control indicates that restrooms must have an occupancy sensor. We have a dorm project where each two dormrooms has a shared bathroom. My understanding is that since the...