LTc7 in a campus projectNC-v4 LTc7: Reduced parking footprintposted by Instra Ingenieros on Apr 20, 2020, 7:34 am
Hi all, We are working on a building that will be in a master site previously LEED certified under a campus appoach. The previous building is certified under NC Warehouse, in the master site... |
|
Alternate Walk-off Mat SolutionsNC-v4 EQc1: Enhanced indoor air quality strategiesposted by Michelle Mirrielees on Apr 21, 2020, 3:12 pm
What would be the suggested way to evaluate the performance of a saw cut, or grooved stone, to consider it having "equivalent or better" performance to a metal grille, or other established... |
|
Precast Wall CalculatorNC-v4 MRc3: Building product disclosure and optimization - sourcing of raw materialsposted by Patty Lloyd on Apr 23, 2020, 11:24 am
Does anyone have a "fillable" precast wall... |
|
Achieving monitoring requirementsNC-v4 EQp1: Minimum indoor air quality performanceposted by Kelvin Su on Apr 24, 2020, 10:34 pm
Sorry i posted this under the wrong version before, reposting it her. It is a BD+C v4 project we are working on and struggling a bit with the monitoring requirements for minimum... |
|
Filtering for direct evaporative coolingNC-v4 EQp1: Minimum indoor air quality performanceposted by Kelvin Su on Apr 26, 2020, 9:46 pm
Do we need to meet the filtration requirments for fresh air when using a DEC cooling? Does anyone have experience with this, as our system does not allow for any kind of filtration post cooling,... |
|
Runoff management strategyNC-v4 SSc4: Rainwater managementposted by Ricardo Sá on Apr 28, 2020, 9:57 am
Dear All, According to Reference Guide: “In a manner best replicating... |
|
LEED v4 ASHRAE 90.1 Simulation- DES Option 1, Path 3. Streamlined ModelingNC-v4 EAp2: Minimum Energy Performanceposted by Eduardo Vidal Kume on Apr 29, 2020, 7:31 am
Hi all, I Would like to use LEED v4 Reference Guide District Enery System, Option 1, Path 3 "Streamlined Modeling" for a Building that has both Disctric Heating and Cooling. The building... |
|
Site with a mix of developed and undeveloped areasNC-v4 SSc4: Rainwater managementposted by Ricardo Sá on May 12, 2020, 5:22 am
Dear All, Option 1 requires on-site management of the runoff from the developed site for the 95th or 98th percentile of local rainfall events. ... |
|
Runoff volume managed for more than leed boundaryNC-v4 SSc4: Rainwater managementposted by Sofia Barahona on May 13, 2020, 5:14 pm
We have a current project, which is the 3rd stage of a data center complex. The fist two stages are already finish and started functioning some time ago. The stormwater management and design was... |
|
Calcium silicate adhesive and PVC jacket adhesiveNC-v4 EQc2: Low-emitting materialsposted by Mark Meaders on May 14, 2020, 9:30 am
We have a project in which we are looking for calcium silicate adhesive and PVC jacket adhesive for mechanical/ plumbing use that comply with the... |