Horizzontally attached bldg addition to Non Certified buildingNC-2009 MPR2: Must be a complete, permanent building or spaceposted by Tesfa Bogale on May 1, 2015, 11:33 am
We are working on a new building addition. The new addition building will be attached horizontally to a non LEED-Certified building. The new addition will be totally new construction with... Last reply: Eric Bautista, Sep 14, 2016, 9:48 pm |
|
Single Building Certification_LEED New Construction 2009NC-2009 MPR2: Must be a complete, permanent building or spaceposted by Aswin M on Dec 23, 2015, 5:42 am
We have a Garment factory project that has three blocks with connectivity bridge. Last reply: Jon Clifford, Dec 30, 2015, 12:06 am |
|
buidable landND-v2009 SLLc6: Steep slope protectionposted by Noriko Nagazumi on Jan 23, 2013, 1:12 am
Hi, Last reply: Noriko Nagazumi, Feb 6, 2013, 2:20 am |
|
Ingress and egressND-v2009 NPDp3: Connected and open communityposted by Colin Day on Sep 9, 2013, 5:18 pm
Hi Eliot, Our project has two vehicle entries on its north side. There is an internal street that connects these two streets, but neither passes all the way through the project site... Last reply: Eliot Allen, Sep 11, 2013, 10:39 am |
|
Is Education still acceptable?NC-v4 INc1: Innovationposted by Deborah Lucking on May 12, 2014, 12:50 pm
Does anyone have any insight on whether Education is still an acceptable way for a project to achieve an Innovation credit point under LEEDv4? Thanks! Last reply: Trista Brown, Jul 20, 2017, 6:01 pm |
|
Concrete Form Release Oil VOC limitNC-v4 EQc2: Low-emitting materialsposted by Ian McCall on Jun 12, 2014, 4:30 am
Dear All, Are concrete form release oil... Last reply: Kimberly Lombardozzi, Jul 10, 2023, 3:26 pm |
|
Must non-potable water sources be used to earn IP credit?NC-v4 IPc1: Integrative processposted by Eesmyal Santos-Brault on Nov 6, 2014, 1:27 am
It appears that this credit can not be earned if a project does not meet some water demand through nonpotable sources. Can anyone confirm if not only consideration but actual use of nonpotable... Last reply: Marcus Sheffer, Aug 17, 2015, 4:02 pm |
|
Glazing (windows) area- VOCNC-v4 EQc2: Low-emitting materialsposted by Caroline PIN on Nov 10, 2014, 10:00 am
Dear all, Last reply: Caroline PIN, Dec 11, 2014, 11:20 am |
|
The parking is Under the buildingNC-v4 SSc5: Heat Island Reductionposted by Radwa Amin on Feb 10, 2015, 10:05 am
Hi, My question is about the parking roof; in our case the roof shall be the "ground floor" and won't... Last reply: Kimberly Schlaepfer, Nov 3, 2017, 3:50 pm |
|
Powder coating mixed with waterNC-v4 EQc2: Low-emitting materialsposted by Caroline PIN on Mar 4, 2015, 7:51 am
Dear all, Is powder coating mixed with water on the jobsite is wet applied products ? technically, the initial product is powder, it is not "wet". Is difficult to get information about... Last reply: Afogreen Build, Jul 4, 2024, 5:59 am |