Reclaimed water from off-siteNC-v4 WEc1: Outdoor water use reductionposted by HoMU WELLTECH on Jul 2, 2019, 12:22 pm
Hello. Our project is in a very dry area, with very little rain. The design team has already chosen plant species with very low water needs (over 40% reduction) but, to supply with the... |
|
Ventilation Requirement for High Rise ResidentialNC-v4 EQp1: Minimum indoor air quality performanceposted by Jay Murray on Jul 3, 2019, 10:07 am
Question: Is it necesary to hard duct ventilation air into each bedroom within the apartment? Or...is it adequate to provide all of the required ventilation for that apartment in one location (ie... |
|
Following Strategy A but no D for regularly occupied spaceNC-v4 EQc6: Interior lightingposted by Edgar Arevalo on Jul 12, 2019, 11:12 am
I'm working on a project, where indirect overhead lighting for a regularly occupied space (garbage truck maintenance garage space) would not be feasible due to height restrictions for vehicle... |
|
Entryway system extends into elevatorNC-v4 EQc1: Enhanced indoor air quality strategiesposted by Angela Barreto on Jul 12, 2019, 5:25 pm
Hi, we have a project with a complying entryway system at ground level. However, the LEED reviewer has pointed out an entryway system is also required at the elevator lobby in our... |
|
Electrical Buses as an Innovation CreditNC-v4 INc1: Innovationposted by on Jul 22, 2019, 12:26 pm
A Mass transit project will be using Electric buses to serve the routes. As for LTc8 Green Vehicles, the project already has preferred parking and EV charging stations covered. The LEEDv4... |
|
Option 3, Exterior wall repair and repointingNC-v4 MRc1: Building life-cycle impact reductionposted by Edgar Arevalo on Jul 23, 2019, 4:26 pm
For this project, certain brick... |
|
5 Year contracts delivered annuallyNC-v4 EAc7: Green power and carbon offsetsposted by Heather Schrock on Jul 31, 2019, 12:46 pm
Hi! I am a... |
|
MERV 11 in garage unitNC-v4 EQp1: Minimum indoor air quality performanceposted by Johanna Koch on Aug 8, 2019, 3:25 am
Do you have to have... |
|
Fresh Air Requirement for Dwelling UnitsNC-v4 EQp1: Minimum indoor air quality performanceposted by Pan Pan on Aug 18, 2019, 10:40 am
Hi! Can I use 62.2-2010 instead of the 62.1-2010 ventilation rate calculation procedure for dwelling units? The project is a 4-story apartment building? Thanks. Hope you can help me. |
|
Refrigeration in manufacturing equipment required & details about VRF calculation?NC-v4 EAc6: Enhanced Refrigerant Managementposted by RDK E&S on Aug 22, 2019, 4:29 pm
Hello all, I'm working on a manufacturing facility that is looking to go for this credit. I have included all HVAC (rooftop units, VRFs, etc.) as well refrigeration systems for a "Cold... |