LEED CI project in China

CI-2009 EAp2: Minimum Energy Performance
posted by Diana Hill on Aug 4, 2012, 7:09 pm

Hello,

We are doing a LEED CI project in China. This is a office building with two 16-floors buildings A, B and a 9-floors building C, which are connected by a 7-floors podium. The project...

Last reply: Marcus Sheffer, Aug 6, 2012, 8:54 pm

CO2 sensors applicable to non regularly occupied space?

NC-2009 IEQc1: Outdoor Air Delivery Monitoring
posted by Helena Larsson on Aug 7, 2012, 5:41 am

I have a question in regards to non-regularly occupied lunch/breakrooms. Default occupancy...

Last reply: John McFarland, Oct 2, 2012, 8:09 pm

Prop 65 Restrictions in IEQ 4 Group 1

LEED for Healthcare forum
posted by Bruce Maine on Aug 16, 2012, 9:13 am

Good morning. I'm having trouble geting my arms around the requirement that adhesives and...

Last reply: Susan Walter, Sep 28, 2012, 1:56 pm

I have restrooms in the

NC-2009 WEp1: Water Use Reduction
posted by Marcio Alberto Casado Pereira on Sep 11, 2012, 10:54 am

I have restrooms in the building I am certifying, an also restrooms with showers in a 40sqm building inside my project boundary. Logically, I am not certifying the last one, but I will use it for...

Last reply: Carlie Bullock-Jones, Apr 2, 2013, 12:41 pm

Are you kidding me?

General forums
posted by Karen Joslin on Sep 17, 2012, 1:25 pm

Opened the email with the "news" and instead of adding the very much needed individual memership...

Last reply: Jill Perry, PE, Oct 10, 2012, 1:40 pm

LEED 2009 CS Appendix 4

CS-2009 SSc9: Tenant Design and Construction Guidelines
posted by Mark Mechling on Sep 21, 2012, 1:52 pm

Hello,
Does anyone know where I can find a template for the Tenant Lease or Sales Agreement discussed in LEED 2009 CS Appendix 4?

Thank you
Mark

Last reply: leila snider, May 31, 2017, 5:32 pm

Non-Predominant Spaces

NC-2009 EAp2: Minimum Energy Performance
posted by Wes Lawson on Sep 28, 2012, 4:29 pm

We are modeling a building that is separated into three different spaces. These spaces have differing functions, schedules and systems. There is an office, manufacturing area, and warehouse...

Last reply: Marcus Sheffer, Oct 4, 2012, 9:43 am

LTcredit: Green Vehicles

General forums
posted by Tanja Arnesson on Oct 9, 2012, 5:31 am

Hi,

Have a wondering regarding the LT credit, Green Vehicles within the 5th Public Comment periode.
Does the project need to fulfill both the requirements regarding 7 % for...

Last reply: Susan Walter, Oct 16, 2012, 10:44 am

Using Heat Pump for Domestic Water Heating

CI-2009 EAp2: Minimum Energy Performance
posted by M.S. Chan on Oct 19, 2012, 3:16 pm

Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5903 thumbs up October 23, 2012- 10:42 am This forum is for EAp2 not EAc1.3. Appendix G is allowed under EAc1.3 but it is not allowed under...

Last reply: Marcus Sheffer, Oct 23, 2012, 10:42 am

District cooling PV array

NC-2009 EAc2: On-Site Renewable Energy
posted by Katherine Ann Resurreccion on Oct 20, 2012, 11:31 am

If the project is district cooled with option 1 where the cooling energy consumption is determined by adding chilled water meter in the energy model for EAc1, in calculating the capacity of the...

Last reply: Marcus Sheffer, Jan 8, 2014, 11:44 am