Log in
Forum
Topic

Reduced parking footprint- Carpool

NC-v4 LTc7: Reduced parking footprint
posted by Ricardo Sá on Nov 16, 2018, 6:22 am

Hi,

one of our clients is trying to certificate an office building in Portugal (using the rating system LEED BD+C: New Construction and Major Renovation).

Parking...

Enhanced indoor air quality strategies in wineries

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Ricardo Sá on Nov 16, 2018, 6:47 am

Hi,

we are evaluating the LEED certification potential of a new winery that will be built in Portugal (using the rating system LEED BD+C: New Construction and Major Renovation)....

Interior lighting in wineries

NC-v4 EQc6: Interior lighting
posted by Ricardo Sá on Nov 16, 2018, 6:58 am

Hi,

we are evaluating the LEED certification potential of a new winery that will be built in Portugal (using the rating system LEED BD+C: New Construction and Major Renovation)....

Quality views in wineries

NC-v4 EQc8: Quality Views
posted by Ricardo Sá on Nov 16, 2018, 7:01 am

Hi,

we are evaluating the LEED certification potential of a new winery that will be built in Portugal (using the rating system LEED BD+C: New Construction and Major Renovation)....

Mixed Use (ICI) Facility has both Option 1. referenced categories

NC-v4 LTc8: Green vehicles
posted by Olawale Taiwo on Nov 21, 2018, 5:41 pm

Background Considerations:

My Project a registered mixed use facility per code and USGBC is an ideal Industrial, Commercial and Institutional (ICI) Building all in one,...

Budget calculation method for build-in cabinetry

NC-v4 EQc2: Low-emitting materials
posted by Izabela Kwiecinska on Nov 29, 2018, 5:25 am

Hi All,

Would you mind helping me with calculating furniture-like items build on site? As counting layers of some assembly may be doable, counting surfaces tor a 3D item may be challenging...

Attached to existing building

NC-v4 EQp1: Minimum indoor air quality performance
posted by Omar Elrawy on Nov 29, 2018, 6:11 am

I have a new building which is to get attached to my existing non-LEED building.  The new prospect LEED NC building is to have a door to access the existing building, so I need to know if I need...

shower location in adjacent building

NC-v4 LTc6: Bicycle facilities
posted by akshaya bhaskar on Dec 4, 2018, 4:59 pm

Hello, 

The project I am working does not meet the shower and changing room requirements  for Bike Facilities credit, on its own. The adjacent building (which is outside the LEED boundary...

LEED Project Boundary on Contract Documents

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by Mark Zoeteman on Dec 5, 2018, 9:22 am

Is it required in v4 BD+C to show LPB on civil and architectural contract documents? Project includes renovation and addition to an existing building.

How many products can use the exact same set of impact category values listed in an industry-wide EPD?

NC-v4 MRc2: Building product disclosure and optimization - environmental product declarations
posted by Keith Robertson on Dec 6, 2018, 2:17 pm

Dear LEED Experts,

I am looking for clarity regarding how many products listed in the BPDO Calculator can use the exact same impact category values listed in an industry-wide EPD.

...