Topic | Recent |
---|---|
Reduced parking footprint- CarpoolNC-v4 LTc7: Reduced parking footprintposted by Ricardo Sá on Nov 16, 2018, 6:22 am
Hi, one of our clients is trying to certificate an office building in Portugal (using the rating system LEED BD+C: New Construction and Major Renovation). Parking... |
|
Enhanced indoor air quality strategies in wineriesNC-v4 EQc1: Enhanced indoor air quality strategiesposted by Ricardo Sá on Nov 16, 2018, 6:47 am
Hi, we are evaluating the LEED certification potential of a new winery that will be built in Portugal (using the rating system LEED BD+C: New Construction and Major Renovation).... |
|
Interior lighting in wineriesNC-v4 EQc6: Interior lightingposted by Ricardo Sá on Nov 16, 2018, 6:58 am
Hi, we are evaluating the LEED certification potential of a new winery that will be built in Portugal (using the rating system LEED BD+C: New Construction and Major Renovation).... |
|
Quality views in wineriesNC-v4 EQc8: Quality Viewsposted by Ricardo Sá on Nov 16, 2018, 7:01 am
Hi, we are evaluating the LEED certification potential of a new winery that will be built in Portugal (using the rating system LEED BD+C: New Construction and Major Renovation).... |
|
Mixed Use (ICI) Facility has both Option 1. referenced categoriesNC-v4 LTc8: Green vehiclesposted by Olawale Taiwo on Nov 21, 2018, 5:41 pm
Background Considerations: My Project a registered mixed use facility per code and USGBC is an ideal Industrial, Commercial and Institutional (ICI) Building all in one,... |
|
Budget calculation method for build-in cabinetryNC-v4 EQc2: Low-emitting materialsposted by Izabela Kwiecinska on Nov 29, 2018, 5:25 am
Hi All, Would you mind helping me with calculating furniture-like items build on site? As counting layers of some assembly may be doable, counting surfaces tor a 3D item may be challenging... |
|
Attached to existing buildingNC-v4 EQp1: Minimum indoor air quality performanceposted by Omar Elrawy on Nov 29, 2018, 6:11 am
I have a new building which is to get attached to my existing non-LEED building. The new prospect LEED NC building is to have a door to access the existing building, so I need to know if I need... |
|
shower location in adjacent buildingNC-v4 LTc6: Bicycle facilitiesposted by akshaya bhaskar on Dec 4, 2018, 4:59 pm
Hello, The project I am working does not meet the shower and changing room requirements for Bike Facilities credit, on its own. The adjacent building (which is outside the LEED boundary... |
|
LEED Project Boundary on Contract DocumentsNC-v4 MPR2: Must use reasonable LEED boundariesposted by Mark Zoeteman on Dec 5, 2018, 9:22 am
Is it required in v4 BD+C to show LPB on civil and architectural contract documents? Project includes renovation and addition to an existing building. |
|
How many products can use the exact same set of impact category values listed in an industry-wide EPD?NC-v4 MRc2: Building product disclosure and optimization - environmental product declarationsposted by Keith Robertson on Dec 6, 2018, 2:17 pm
Dear LEED Experts, I am looking for clarity regarding how many products listed in the BPDO Calculator can use the exact same impact category values listed in an industry-wide EPD. ... |