Log in
Forum
Topic

Tenant water metering

CS-v4 WEc4: Water metering
posted by Anya Fiechtl on Feb 13, 2022, 3:06 pm

Can a Core&Shell project achieve this credit by submetering tenant water use?

Tenants supplied by water utility company

CS-v4 WEp3: Building-level water metering
posted by Ricardo Sá on May 13, 2022, 4:35 am

Dear All,

we’re currently involved in the LEED certification (Core & Shell) of a new development. In this project, tenant’s water supply will be ensured directly by the local...

Minimum Energy Performance Calculator

CS-v4 EAp2: Minimum Energy Performance
posted by Lucy Townsend on Sep 27, 2022, 4:02 am

Hi,

Has anyone had any issues filling out the minimum energy performance calculator? We have followed ASHRAE guidance for modelling but some of the inputs don't align with what is in the...

Do loading dock doors count as building entries?

CS-v4 EQp2: Environmental tobacco smoke control
posted by James Jin on Oct 14, 2022, 1:31 pm

Hi all,

For the Environmental Tobacco Smoke control prerequisite, I would like to ask whether loading dock doors for trucks on a warehouse or industrial building also count as building...

CxA Experience Validation

CS-v4 EAc1: Enhanced Commissioning
posted by Michaël Briffaz on Oct 19, 2022, 9:21 am

Hey,

We would like to submit the experience and references for a...

LT Credit High-Priority Site in outside the U.S

CS-v4 LTc3: High priority site
posted by INAE SUH on Oct 19, 2022, 8:10 pm

Has anyone earned the credit about high priority site- Option2. Priority designation outside the U.S?

The project site is nationally administered and designated National industrial complex...

Recycling rate of construction and demolition waste

CS-v4 MRc5: Construction and demolition waste management
posted by Tiago Rigobello on Nov 4, 2022, 5:08 pm

How can we prove the recycling rate of construction and demolition waste made by the recycler? What are the options in Brazil?

Thanks! Best regards!

On site or Off site seperation

CS-v4 MRc5: Construction and demolition waste management
posted by Andrea Tirao on Nov 10, 2022, 7:59 am

Our project has extensive generation of wastes into different activity zones. For this reason, the Contractor's strategy is to bring the wastes directly off-site comingled and the waste hauler...

Refrigerants: Heat-pump out of leed boundady

CS-v4 EAc6: Enhanced Refrigerant Management
posted by D M on Jan 27, 2023, 6:50 am

Hi,

i checking a building that has the main heat pump out of leed boundary, it is in common with other 2 buildings (not leed certified).

Should I to consider this heat pump for...

Connector Service to other bus routes

CS-v4 LTc5: Access to quality transit
posted by Nadia Azzam on Jan 30, 2023, 4:09 pm

I am working on a project with one of the stops serving a connector service. This is basically a bus route that connects to other routes. Can we count the other routes it connects to since...