Topic | Recent |
---|---|
What transit type is the Subway (underground) System?CI-v4 LTc3: Access to quality transitposted by Olga Yuil on Dec 13, 2017, 2:55 pmhttps://leeduser.buildinggreen.com/forum/subway-same-light-rail Log in or register to post comments emily reese moody Sustainability Director, Certifications & Compliance Jacobs LEEDuser Expert 477 thumbs up January 16, 2018- 1:35 pm Hi all, I emailed... Last reply: emily reese moody, Jan 16, 2018, 1:35 pm |
|
Baseline System 8CI-v4 EAp2: Minimum Energy Performanceposted by Gustav Alfaro on Apr 14, 2018, 7:06 pm
Hi to all, Our project scope is modeling one floor of a 20 stories office building. It is clear that we must use system 8 for the baseline based on the full office building... Last reply: Tyler Thumma, Jun 10, 2020, 3:08 pm |
|
LEED CI V4 Tenant space modeling interpretationCI-v4 EAp2: Minimum Energy Performanceposted by Vipul Babriya on May 9, 2018, 2:38 pm
Hello, We have a fit out project for medical offices ~16,000 SF that is going for LEED CI V4 certification. The... Last reply: Marcus Sheffer, May 11, 2018, 11:26 am |
|
Client renting the entire buildingCI-v4 EAc3: Advanced Energy Meteringposted by Katarzyna Toczynska on Jul 12, 2018, 8:21 am
Hi, I have a CI project where an entire building is going to be leased for our Client. The building has all the systems built (including ventilation and VRF system). Our Client will manage... Last reply: Katarzyna Toczynska, Jul 16, 2018, 10:37 am |
|
Space Control ASHRAE 90.1 2010 9.4.1.2CI-v4 EAp2: Minimum Energy Performanceposted by Ciaran McCabe on May 22, 2019, 8:14 am
ASHRAE 90.1 2010 9.4.1.2 Space Control states: "Each space enclosed by ceiling height partitions shall have at least one control device to independently control the general lighting... Last reply: Edna Urias, Jul 30, 2019, 4:09 pm |
|
Base buildings required in calculator & WaterSense labelled?CI-v4 WEp1: Indoor water use reductionposted by RDK E&S on Sep 3, 2019, 2:57 pm
Hi everyone, I received a comment on a project for not including base building fixtures in the water reduction calculator. Based on the LEED user excerpt below, I was led to believe they... Last reply: Eric Bautista, Feb 15, 2020, 6:23 pm |
|
Total Annual ConsumptionCI-v4 EAc3: Advanced Energy Meteringposted by Deborah Stadler on Jun 26, 2020, 7:54 am
Our CI project is not doing an energy model, but using the prescriptive method (AEDG). What is the acceptable way to determine the Total Annual Consumption to confirm uses above the 10% that... Last reply: Marcus Sheffer, Mar 30, 2023, 11:24 am |
|
Option 2. Prescriptive ComplianceCI-v4 EAp2: Minimum Energy Performanceposted by Dave Hubka on Oct 15, 2021, 10:45 am
kinda embarrassed to ask this one, but here goes... The ref guide and credit template require the team to upload the Target Finder performance results when pursuing Option 2. Prescriptive... Last reply: Michelle Rosenberger, Aug 15, 2023, 11:51 am |
|
Copy/Printing Room- Client against adding a doorCI-v4 EQc1: Enhanced indoor air quality strategiesposted by Edgar Arevalo on May 29, 2024, 12:03 pm
I am working on a CI project where the client is against putting a self-closing door (or any door for that matter) to the copy/printing room inside the project space. Typically, I have ran into... Last reply: emily reese moody, Jun 5, 2024, 7:56 pm |
|
VOC- exempt compounds larger than 1%Retail-NC-v4 EQc2: Low-emitting materialsposted by Ian McCall on May 23, 2014, 9:37 am
Hello, Last reply: Reinhard Oppl, Dec 19, 2016, 10:26 am |