Stormwater Management in a project without pre-existing infrastructureNC-v4 SSp1: Construction Activity Pollution Preventionposted by Amine Zeidane on Jan 25, 2019, 4:20 am
Hello, I'm working on a mixed-use tower construction project in Morocco. The site being near a pretty big river that crosses the city, coming from the ocean nearby, the contractor... |
|
Zinc Rich PrimerNC-v4 EQc2: Low-emitting materialsposted by LEED Pro Consultant on Jan 29, 2019, 6:39 pm
Hi, We are working on a project that intends to apply a zinc-rich primer whose concentration is below 340 g/L (According to California Air Ressources Board). The volume is so low... |
|
Preferred Parking- DefinitionNC-v4 LTc7: Reduced parking footprintposted by Priya Venkat on Jan 31, 2019, 5:36 am
For a group project, with 2 distinct car parking area in site, should we provide preferred parking spaces for each building? Or, should we provide preferred parking in each parking area? ... |
|
Which percentile to use from ITE Tables?NC-v4 LTc7: Reduced parking footprintposted by Erica Downs on Feb 5, 2019, 10:11 am
The v4 reference guide refers users to the ITE 3rd Ed. Tables 18-2 through 18-4. The tables have parking generation rates for "33rd percentile", "average", and "85th percentile". How do we know... |
|
VRP Calculations- compliant or notNC-v4 EQp1: Minimum indoor air quality performanceposted by susan eguia on Feb 7, 2019, 5:26 pm
Hi, We completed the VRP calculations and the summary tab under "Outdoor air intake flow provided meets or exceeds Vot?", it says Yes or No for each system. What is the rule of... |
|
BPDO EPDs for typically excluded Masterspec divisions (MEP), without adding to costs for BPDO Sourcing of Raw Material?NC-v4 MRc3: Building product disclosure and optimization - sourcing of raw materialsposted by Renee Shirey on Feb 7, 2019, 7:02 pm
Can I gather EPDs for MEP equipment, and NOT be required to include the cost of those products in the calculations for Sourcing of Raw Materials? The Reference Book is clear that "the... |
|
IEQ- Interior lighting control (Scene switch)NC-v4 EQc6: Interior lightingposted by Aravindraj RB on Feb 10, 2019, 11:31 pm
Hello, I've been working on an office building which provided manual switches for every 5 lights or so since the built up area is around 4000 ft2. My query is, For individual occupant... |
|
Daylight Sensor and/or Occupancy SensorNC-v4 EAp1: Fundamental commissioning and verificationposted by Purva Saxena on Feb 11, 2019, 1:33 am
Are primary side-lighted areas to be provided with Daylight Sensor, even though these spaces (conference room, meeting rooms, private cabins with area less than 250 sq. ft.) are already provided... |
|
Specific design strategies to comply with Construction IAQ PlanNC-v4 EQc3: Construction indoor air quality management planposted by Amine Zeidane on Feb 13, 2019, 4:59 am
Hello, Whate are the specific design strategies that must appear on HVAC Design Drawings regarding Construction indoor air quality management plan, apart from Filtration media ? ... |
|
Quality Transit- DistanceNC-v4 LTc5: Access to quality transitposted by Priya Venkat on Feb 19, 2019, 3:44 am
My project is located in a huge campus, and the distance to the main entrance of the campus is more than 800 m... |