Topic | Recent |
---|---|
Solar PanelsNC-2009 EAc2: On-Site Renewable Energyposted by Paula Hernandez on Jan 9, 2017, 8:35 am
Hello, Last reply: Marcus Sheffer, Feb 16, 2021, 5:09 pm |
|
ASHRAE 90.1-2007: Minimum Efficiency Requirements (Heat pump)NC-2009 EAp2: Minimum Energy Performanceposted by Jorge Mato Rial on Jun 27, 2017, 11:41 am
Hello Everyone: Last reply: Jorge Mato Rial, Jul 5, 2017, 2:53 am |
|
Minimum Indoor Air Quality Performance CalculationNC-2009 IEQp1: Minimum indoor air quality performanceposted by Amal Venugopal on Jul 4, 2017, 7:27 am
My Project is Having one FAHU on roof which is supplying treated Fresh air to all... Last reply: Andrey Kuznetsov, Apr 29, 2023, 4:16 pm |
|
Roof deck entry mats?NC-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by Erica Downs on Jul 27, 2017, 12:57 pmentryway... attached to outside spaces.' Per the definition, GBCI is allowed to enforce the installation of entryway systems at roof decks/patios. I understand this a v3 forum question, but on a past v3... Last reply: Dave Hubka, May 16, 2018, 9:04 am |
|
No IrrigationEBOM-2009 WEc3: Water Efficient Landscapingposted by RASHID HAMEEN on Mar 17, 2010, 6:24 am
We have more than 5% vegetation but we don't have any irrigation system. Watering is only done at some plants only and that is also is done when needed. All the other areas are covered with... Last reply: Tristan Roberts, Apr 13, 2010, 6:22 pm |
|
Private vs Public Lavatory FaucetsEBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Dianne Herrin on May 3, 2010, 6:11 pm
I am seeking clarification on the difference between "public" and "private" lavatory faucets under UPC 2006. My... Last reply: Emily Purcell, Dec 9, 2021, 9:30 am |
|
Discussion on inclusion of potential critical zonesEBOM-2009 IEQp1: Minimum indoor air quality performanceposted by John Beeson on May 23, 2010, 10:59 pm
Ok, this prereq, in my mind, is more of a design-based item. And this is a long comment for a particularly fuzzy issue in my mind. Apologies ahead of time. As critical zones are used for... Last reply: Roger Chang, Jun 11, 2010, 4:58 pm |
|
2 years metering dataEBOM-2009 EAp1: Energy efficiency best management practices - planning, documentation and opportunity assessmentposted by Rachael McClain on May 26, 2010, 1:46 pm
For the Level I Energy audit, it requires analysis of two or more years of utility consumption and cost. The building we are trying to certify shares an electric meter with other buildings on... Last reply: Igor Barer, Jun 4, 2010, 8:05 pm |
|
Pressure of water supply for faucets/showerheadsEBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Yong Lee Low on Jul 27, 2010, 4:10 am
Does the flow rate to be specified in the online template for all the kitchen/public and private lavatory faucets/showerheads to be at a specific PSI? For. eg. the showerhead used in the building... Last reply: Jenny Carney, Aug 18, 2010, 11:45 am |
|
HVAC Zone deffinitionEBOM-2009 IEQc2.3: Occupant comfort - thermal comfort monitoringposted by David Grosdeck on Sep 14, 2010, 11:51 am
Please provide additional clarification on "HVAC zone" for this credit. We have a 4 story building. Our current BAS has temperature sensors located on the 1st and 4th floors to provide adequate... Last reply: David Grosdeck, Sep 22, 2010, 11:40 am |