Topic | Recent |
---|---|
EQc6-lightingNC-v4 EQc6: Interior lightingposted by CR ZHANG on Jun 20, 2018, 2:53 am
strategy A: if cut sheet for cd/m2 cannot be provided, could i use conversion forum: L(lux)/R(reflectance) = E (cd/m2) to get the independent result of the data? How should I consider 45-... |
|
Core & Shell with HVAC as future / CI scopeNC-v4 EAp1: Fundamental commissioning and verificationposted by Stacey Olson on Jun 20, 2018, 12:36 pm
If a project is a cold, dark shell without hot water, can... |
|
Laminating Adhesives applied off-siteNC-v4 EQc2: Low-emitting materialsposted by Catalyst Partners on Jun 21, 2018, 5:03 pm
For the laminating adhesives, v2009 required all laminating adhesives on and off site to contain no urea-formaldehyde. LEEDv4 is less clear on this, but for all we can tell, compliance to the... |
|
Crosswalk with PEER?NC-v4 INc1: Innovationposted by emily reese moody on Jul 11, 2018, 7:38 pm
I have a project that is located on a campus that earned PEER certification, and the client is asking how we can incorporate that as a benefit for our project, which is fed through the energy... |
|
Cooling Tower drift eliminator- standards for processesNC-v4 WEp2: Indoor water use reductionposted by Dionisio Franca on Jul 13, 2018, 5:45 am
We checked the drift eliminator specs with the manufacturer selected for our project and they told us that that their draft eliminators reduce drift to 0.05% only. Has anyone experienced this... |
|
HC credit Places of RespiteNC-v4 INc1: Innovationposted by Emily Purcell on Jul 17, 2018, 12:36 pm
Hi, Wondering if anyone has had experience (successful or not) using this health care credit for an NC innovation point. I'm looking at a senior living project that will... |
|
Regularly occupied space that has high bay lighting fixtures but needs to comply with Strategy DNC-v4 EQc6: Interior lightingposted by Edgar Arevalo on Jul 26, 2018, 1:36 pm
There is a garage space that acts as an auto service... |
|
Blower Door Test for Residential UnitsNC-v4 EQp2: Environmental tobacco smoke controlposted by on Jul 26, 2018, 2:03 pm
If a residential project has 4 floors of condos that allow smoking above 5 floors of apartments that do not allow smoking, does there need to be a blower door test performed for every unit, or... |
|
Water analysisNC-v4 WEc3: Cooling tower water useposted by Floyd Valade on Jul 27, 2018, 4:52 am
The documentation requirements for WEC3 requires the non-potable water analysis if using 100% non-potable (for 2 points). |
|
LEED for Schools and Low-Emitting Credit- Furniture CategoryNC-v4 EQc2: Low-emitting materialsposted by Kristin Purdy on Jul 31, 2018, 10:18 am
Our project is pursuing the Low-Emitting Materials Credit under LEED v4 for Schools. We have several questions on how to approach the furniture category under this credit. 1. ... |