Log in
Forum
Topic

Fixture Usage Group

NC-2009 WEp1: Water Use Reduction
posted by Mike D on Jun 18, 2013, 8:57 am

Hi,

The project has male and female restrooms with urinals in the male restrooms, as well as unisex restrooms without urinals in the basement and ground levels.

Initially, I had...

Last reply: Heather DeGrella, Sep 5, 2014, 5:14 pm

more than 1 system to simulate baseline building?

NC-2009 EAc1: Optimize Energy Performance
posted by jaume balana on Jun 27, 2013, 10:25 am

Hello,

Our project is a two floors and 1300 m2 building, opened to four orientations. We have some problems with the unmet hours, because there is no a representative area, where...

Last reply: jaume balana, Jul 1, 2013, 9:47 am

High bay Areas LPD

NC-2009 EAp2: Minimum Energy Performance
posted by Saju Varghese on Jun 27, 2013, 11:32 am

We are working on a project with a bus repair...

Last reply: Marcus Sheffer, Jul 1, 2013, 11:17 am

Steel reporting for MRc5

NC-2009 MRc5: Regional Materials
posted by Tiffany Moore on Jul 2, 2013, 6:20 pm

Tristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11477 thumbs up July 12, 2013- 4:25 pm I would reference the addenda that talks about this. I think we talk about it in our guidance on LEEDuser above and on MRc4.The fabrication point is fine as the manufacturing location, but I agree that the scrap yard is better as the extraction location. This is a bit of a gray area, however, as you have probably noticed from these forum discussions. Log in or register to post comments Tiffany Moore Built Environment Professional Built Kansas City LLC LEEDuser Basic Member 35...

Last reply: Charline SEYTIER, Nov 4, 2013, 8:00 am

Shower location

NC-2009 SSc4.2: Alternative transportation - bicycle storage and changing rooms
posted by K Nakamura on Jul 18, 2013, 5:43 pm

The 200 yard rule applies to bicycle racks outside of the project boundary but how about public showers outside of the project boundary? I am working on a college building and the building next...

Last reply: Sara Zoumbaris, Jun 5, 2014, 2:22 pm

Steel Anchor Bars- Distances

NC-2009 MRc5: Regional Materials
posted by Lilian Seow on Jul 24, 2013, 2:07 pm

Hi there
I think it's pretty obvious this is not going to comply but thought I bring this up for any comments or reconfirmation.

Extraction & Mill [Germany] - Final Manufacturing...

Last reply: Lilian Seow, Jul 26, 2013, 8:30 pm

Multiple Zone or 100% OA (fancoil to outside air)

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Marina Andrade on Aug 5, 2013, 3:42 pm

Hi!

I have a project where a fan coil is providing outside air (outside air treated) to other fancoils.

How do I enter this fan coil (outside air) on the worksheet 62MZCalc?

...

Last reply: Marina Andrade, Aug 6, 2013, 9:43 am

Natural Ventilation Compliance- ASHRAE 62.1 2007 for LEED

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Marina Andrade on Aug 7, 2013, 9:52 am

Hi!

the only method to check compliance is this?

- Based on Space Floor Area – Both
Interior and Perimeter Spaces

- Limitation on Distance of Interior
Spaces from...

Last reply: Marina Andrade, Aug 7, 2013, 1:19 pm

Anti-Rust Additive for Paints

NC-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by Alexis Thompson on Aug 8, 2013, 5:32 pm

What if.... you have two products being purchased for a project: 1) a zero-...

Last reply: Deborah Ebersole, Jul 27, 2017, 2:05 pm

Full credits achieveable for less than 1% landscape?

NC-2009 WEc1: Water Efficient Landscaping
posted by Mary Haw on Sep 4, 2013, 10:22 pm

Our project has less than 1% landscape area vs site area and therefore negligible potable water consumption for irrigation. According to the LEED criteria, this means that 4 credits will be lost...

Last reply: Andrey Kuznetsov, Nov 5, 2014, 3:56 pm