Reuse of window glass for contstruction fillCS-2009 MRc2: Construction Waste Managementposted by Maria Glädt on Apr 15, 2016, 6:12 am
We're involved in a Project where the Contractor wants to send the window glass to a facility that crushes the glass. The crushed glass material can after this be used as construction fill for... Last reply: RETIRED, Apr 15, 2016, 9:02 am |
|
Discrepancy between credit requirements and credit specificsPilot-Credits MRpc52: Material multi-attribute assessmentposted by Jody Lee Potvin-Jones on May 21, 2015, 7:43 am
I'm having a hard time understanding why it is necessary to document cost, weight and "percentage of product contributing to this criterion", if the requirements are simply to use 20 different... Last reply: Chloe Bendistis, Apr 13, 2016, 5:14 pm |
|
Mastersite scorecard Construction ReviewLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Susannah Goddard on Apr 12, 2016, 9:37 am
My project is a Campus project. All of the credits sought on the Mastersite scorecard are "Awarded" after Final Design Review (and appeal in some cases). What do I do now? Do I still need to... Last reply: Susannah Goddard, Apr 13, 2016, 10:13 am |
|
Separating waste- reuse at householdCI-2009 MRc2: Construction Waste Managementposted by Maria Glädt on Apr 7, 2016, 8:08 am
We have a project where there for example lighting fittings, some doors etc. that would be possible to... Last reply: RETIRED, Apr 7, 2016, 3:28 pm |
|
Suburban achieving SSc2NC-2009 SSc5.2: Site development - maximize open spaceposted by Martin Meehan on Mar 31, 2016, 8:32 am
The credit language states that projects in Urban areas achieving SSc2 can contribute with green roof/pedestrian oriented hardscape. Are projects in Suburban areas achieving SSc2 allowed... Last reply: Saurabh Shrestha, Apr 6, 2016, 10:07 pm |
|
Supply temperature for the baseline buildingNC-2009 EAp2: Minimum Energy Performanceposted by Jordan Kirrane on Mar 8, 2016, 3:59 am
I am doing an ASHRAE 90.1-2007 PRM analysis. We have a DOAS CV laboratory design that has a requirement between 10-20ACH in lab zones and a room set point of 20degC. The baseline system is... Last reply: Marcus Sheffer, Mar 30, 2016, 10:59 am |
|
EA Prerequisite Minimum Energy PerformanceEBOM-v4 EAp2: Minimum Energy Performanceposted by Jordan Kirrane on Jan 15, 2016, 11:50 am
I'm currently completing the form for the above prerequisite to achieve the credit for EA Credit Optimize Energy Performance under Case 2, Option 2. Benchmark against historical data (0-14 points... Last reply: Ben Stanley, Mar 29, 2016, 12:00 pm |
|
Cyclist provision for hotelsNC-v4 LTc6: Bicycle facilitiesposted by Alicia Costas Freire on Oct 26, 2015, 1:56 pm
Hello, I am currently working on the LEED assessment of a hotel. My understanding of the requirements is that hotel guests can be excluded from the calculation of cyclist provision... Last reply: Qiongwen Kong, Mar 23, 2016, 1:14 pm |
|
Percentage of Light Output/Wattage DimmedCI-2009 EAc1.2: Optimize energy performance - lighting controlsposted by Jordan Kirrane on Mar 22, 2016, 2:04 pmLEEDuser Expert 5738 thumbs up March 23, 2016- 11:23 am I answer questions here because it is in a public forum benefiting many. Sending me drawings crosses the line into my fee for service consulting... Last reply: Marcus Sheffer, Mar 23, 2016, 11:23 am |
|
Determination of 2 year energy consumptionNC-2009 EAc6: Green Powerposted by Jordan Kirrane on Mar 21, 2016, 5:46 am
Hi there, My project wishes to calculate the GWh of... Last reply: Jean Marais, Mar 21, 2016, 12:51 pm |