Log in
Forum
Topic

Has anyone experienced a LEED

CI-2009 SSc1: Site Selection
posted by Alessio Zampaglione on Apr 3, 2012, 5:45 am

Has anyone experienced a LEED CI in a building that is under LEED CS final certification? The question is: can I register a LEED CI and obtain the LEED CI final certification even if the whole...

Last reply: Susann Geithner, Jul 5, 2012, 11:30 am

LEED CI project in China

CI-2009 EAp2: Minimum Energy Performance
posted by Diana Hill on Aug 4, 2012, 7:09 pm

Hello,

We are doing a LEED CI project in China. This is a office building with two 16-floors buildings A, B and a 9-floors building C, which are connected by a 7-floors podium. The project...

Last reply: Marcus Sheffer, Aug 6, 2012, 8:54 pm

Using Heat Pump for Domestic Water Heating

CI-2009 EAp2: Minimum Energy Performance
posted by M.S. Chan on Oct 19, 2012, 3:16 pm

Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5796 thumbs up October 23, 2012- 10:42 am This forum is for EAp2 not EAc1.3. Appendix G is allowed under EAc1.3 but it is not allowed under...

Last reply: Marcus Sheffer, Oct 23, 2012, 10:42 am

Recertification

CI-2009 PIf5: Previously LEED Certified Details
posted by David Wood on Jun 18, 2013, 11:09 am

Good morning, I had a question about recertification. My building is currently certified under V2.0 and we are up for recertification in 2015. We recieved certification in 2010. The question...

Last reply: Barry Giles, Aug 9, 2013, 2:31 pm

NSF 140 Gold vs Platinum

CI-2009 IDc1: Innovation in Design
posted by Kristine Byers on Jul 30, 2013, 5:55 pm

We are considering an ID Credit for having all of the carpet on the project NSF 140 Certified. My questions:
1. Is this ID Credit still available for CI2009?
2. We have a combination...

Last reply: Adolfo Salas, Mar 24, 2016, 10:01 am

HK Equivalent of Energy-Star qualified products

CI-2009 EAc1.4: Optimize energy performance - equipment and appliances
posted by BEE Incorporations on Mar 26, 2014, 2:12 am

Hi,

We are sourcing local equivalent of Energy-Star qualified products in Hong Kong and have found most products are certified by HK Energy Label. Could anyone please tell me what the...

Last reply: Mike D, Apr 1, 2014, 12:47 pm

ENERGY STAR UPS- 160KW and 480V

CI-2009 EAc1.4: Optimize energy performance - equipment and appliances
posted by Carla Lopez on Nov 19, 2014, 4:34 pm

Hi,

It is of my best understanding that the UPSs are included as "eligible equipment" for both EAp2 and EAc1.4 as stated on the LEED for Commercial Interiors v2009 Reference Guide since...

Last reply: Danna Richey, Nov 8, 2018, 2:55 pm

Reviewr's Comment is requesting labor and delivery

CI-2009 MRc4: Recycled Content
posted by Sarah Thompson on Mar 6, 2015, 4:34 pm

In all my 40 LEED projects I have never included labor and delivery to a material's cost total. I received the following comments and am at a loss as to how to respond:

Let me also be...

Last reply: RETIRED, Mar 9, 2015, 10:57 am

ULEF/CARB meeting credit criteria?

CI-2009 IEQc4.4: Low-emitting materials - composite wood and agrifiber products
posted by William Weaver on Jun 25, 2015, 10:22 am

We just received preliminary review comments on a project and this credit was marked pending as a result of one...

Last reply: Brent Ehrlich, Jul 17, 2018, 2:33 am

energy modeling

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Bethany Beers on Dec 18, 2015, 9:43 pm

We have a tenant fit out of a single floor in an 8 story building. The new design is an energy efficient chilled beam system, and the central plant remains unchanged. Do I need to include the...

Last reply: Marcus Sheffer, Aug 9, 2016, 10:21 am