Furniture: All materials are low emitting, but no furniture evaluationNC-v4 EQc2: Low-emitting materialsposted by Antti Karppinen on Nov 24, 2021, 2:33 am
Hi, Is it possible to comply with furniture evaluation, if a piece of furniture doesn't have the needed certfication, but all the materials (e.g. composite... |
|
Is "rainwater collected" considered "reclaimed water"?NC-v4 WEp3: Building-level water meteringposted by Sara BENLOUBA on Dec 20, 2021, 2:06 am
Is "rainwater collected" considered "reclaimed water", I am very... |
|
LEED rating for warehouseNC-v4 MPR2: Must use reasonable LEED boundariesposted by ed HvacSimulator on Dec 21, 2021, 10:17 am
Hi all, thanks for help! |
|
Clo levels for winter and summerNC-v4 EQc5: Thermal comfortposted by Gregory Mason on Dec 22, 2021, 12:17 am
Hi, We have had EQc5 rejected for one of our projects because one of the common area kitchen spaces is failing during winter due to being too warm, and kitchen spaces require a MET of at... |
|
LEED boundaries for 2 different projectsNC-v4 SSc4: Rainwater managementposted by Mohammed Fadili on Dec 30, 2021, 9:48 am
Hello all, I am currently working on the certification of 2 separated buildings with different usages (separated HVAC and plumbing systems), both are following the v4 BD+C NC. The issue is... |
|
Site Visits for Commissioning Agent?NC-v4 EAp1: Fundamental commissioning and verificationposted by Kasandra Martin on Jan 3, 2022, 12:41 pm
What is the average number of site visits for the Commissioning Agent? It appears a summer and winter for HVAC. One prior to occupancy and then one several months after everything has been... |
|
Illuminance Value CalculationNC-v4 EQc6: Interior lightingposted by on Jan 6, 2022, 3:59 pm
What program/process is most helpful for caluclating separate illuminance values for ceilings/walls/work surfaces? I have not been able to track down a process that will allow me to do this.... |
|
Construction of site continuing after building completedNC-v4 MRp2: Construction and demolition waste management planningposted by Adam Huckstep on Jan 25, 2022, 10:36 am
Hi All, I have a question on how to handle a project where construction will continue after the projects building is complete and ready for occupancy. Background: The project includes a... |
|
Pilot Credit INpc155NC-v4 EQp1: Minimum indoor air quality performanceposted by Vassil Vassilev on Jan 26, 2022, 2:27 am
Greetings, In an attempt of following this Pilot credit, the following question (related to #1b. of the Requirements) appeared: In case our project has no recirqulation, meaning it... |
|
Legal Wood- Wood Harvested on-Site?NC-v4 MRc3: Building product disclosure and optimization - sourcing of raw materialsposted by Vincent Pieri on Jan 27, 2022, 4:13 pm
We are working on the modernization of the Visitor's Center at the El Yunque National Rainforest in Puerto Rico. El Yunque is a USFS National Park, and the forest is managed by the USFS and... |