Bamboo flooring

NC-2009 IEQc4.4: Low-emitting materials - composite wood and agrifiber products
posted by Jason Grant on Mar 26, 2013, 1:33 pm

Does this credit cover bamboo flooring?

Last reply: Nelina Loiselle, Apr 30, 2014, 11:31 am

Does 10-4 Mandatory provision apply for process electric motors?

NC-2009 EAp2: Minimum Energy Performance
posted by Valentin Grimaud on Mar 27, 2013, 12:37 pm

Dear community,

I would like clarifications about the scope covered by the section 10-4 of the ashrae 90.1-2007: in an industrial project, there may be lots of electric motors related to...

Last reply: Marcus Sheffer, Apr 4, 2013, 10:40 am

F-factor of slab for Proposed Design

NC-2009 EAp2: Minimum Energy Performance
posted by Alicia Villanueva on Apr 8, 2013, 4:52 pm

Dear alll,

From a preliminary review, we received a comment regarding the Energy Modeling saying that the slab on grade floor of the proposed should be modeled using a F-factor, and not...

Last reply: Jean Marais, Apr 30, 2013, 10:31 am

Exterior lighting vs. LPB

NC-2009 EAp2: Minimum Energy Performance
posted by Marcio Alberto Casado Pereira on Apr 16, 2013, 10:22 am

We have a multiple building Project and the LEED Project Boundary of the 4 buildings to be certified do not sum up to be equal do the LEED Campus Boundary, which is according with AGMBC 2010 page...

Last reply: Marcus Sheffer, Apr 17, 2013, 9:53 am

Modeling LEED 2009 District Energy Systems

NC-2009 EAc1: Optimize Energy Performance
posted by Dónal O'Connor on Apr 17, 2013, 6:25 pm

For LEED 2009, when modeling the proposed building which incorporates the...

Last reply: Dónal O'Connor, May 28, 2013, 10:15 am

Bicycle Storage for a Daycare

NC-2009 SSc4.2: Alternative transportation - bicycle storage and changing rooms
posted by komal kotwal on Apr 24, 2013, 3:08 pm

We are pursuing a daycare center under LEED NC v2009. We are proposing to use the LEED for Schools requirement (5% or more of all building staff and students above grade 3 level) and some...

Last reply: Kathryn West, Dec 12, 2013, 5:46 pm

Mixed use

NC-2009 SSc4.4: Alternative transportation - parking capacity
posted by Sara Greenwood on Apr 25, 2013, 12:24 pm

Hello,

My project is pursing Case 2 for residential projects since it has less than 10% of retail space. I understand that a mix of infrastructure programs are required to support ride...

Last reply: Emily Purcell, Feb 28, 2018, 6:02 pm

Recycled Soil and Aggregate

NC-2009 MRc4: Recycled Content
posted by Lyle Axelarris on May 15, 2013, 6:15 pm

answer your question on 31 20 00 but I am not aware of anyone who is monitoring this forum to answer questions. Log in or register to post comments Joel McCreary Principal McCreary/Snow Architects, PA...

Last reply: RETIRED, May 22, 2013, 9:23 am

Ventilation requirements for naturally ventilated spaces

NC-2009 EAp2: Minimum Energy Performance
posted by Jean Marais on May 29, 2013, 4:26 am

A difficalt case: Radiant floor + Nat Vent
LEED increased ventilation credit requires that when using the macroscopic airflow simulation compliance path for naturally ventilated spaces:...

Last reply: Jean Marais, Jun 4, 2013, 10:30 am

Fixture Usage Group

NC-2009 WEp1: Water Use Reduction
posted by Mike D on Jun 18, 2013, 8:57 am

Hi,

The project has male and female restrooms with urinals in the male restrooms, as well as unisex restrooms without urinals in the basement and ground levels.

Initially, I had...

Last reply: Heather DeGrella, Sep 5, 2014, 5:14 pm