Modelling Naturally ventilated ParkingNC-2009 EAp2: Minimum Energy Performanceposted by Maya Karkour on Apr 13, 2012, 1:03 pm
Dear all, Will a project get credit for having naturally ventilated parking? I.e., should my baseline be modelled with mechanical ventilation, or will it have to be same as the proposed?... Last reply: Marcus Sheffer, Oct 1, 2012, 11:18 am |
|
Space exclusion from ASHRAE 62.1-2007NC-2009 IEQp1: Minimum indoor air quality performanceposted by Yury Lui on May 23, 2012, 7:06 pm
Question: If the rooms are not occupyable rooms, are they subject to the minimum OA rates in the ASHRAE 62.1-2007 standard? It makes no sense to use more energy to provide outside air to these... Last reply: Hernando Miranda, Jul 5, 2012, 12:32 pm |
|
Baseline System SelectionNC-2009 EAc1: Optimize Energy Performanceposted by Hirak Patel on Jul 16, 2012, 2:33 pm
We are simulating Airport Traffic Controller building and have question regarding baseline system. Building is 13 story and have 27,000 sf. However, out of 13 floors, only 3 floors have... Last reply: Francesco Passerini, Feb 12, 2014, 11:41 am |
|
Efficiencies for System 4 – PSZ-HP (packed roof top heat pump)NC-2009 EAc1: Optimize Energy Performanceposted by Francesco Passerini on Sep 27, 2012, 10:21 am
According to Table G3.1.1A for the baseline model I have to model System 4 – PSZ-HP (packed roof top heat pump). Last reply: Francesco Passerini, Oct 10, 2012, 6:28 am |
|
Comprehensive Transportation Management PlanNC-2009 SSc4.1: Alternative transportation - public transportation accessposted by Julie Blue on Oct 9, 2012, 12:00 pm
We have submitted for an Exemplary Performance ID credit by creating a transportation management plan. The review comments came back that "the project has not earned at least three SSc4 credits... Last reply: emily reese moody, Apr 30, 2020, 2:43 pm |
|
International project-onsite renuable energyNC-2009 EAc6: Green Powerposted by Mahbuba Khan AIA, LEED AP BD+C on Nov 28, 2012, 6:54 pm
An industrial building client in Bangladesh wants to produce most of it's power by gas operated generator. About 10%-15% power will also be generated from solar panels and small wind turbines.... Last reply: Marcus Sheffer, Jan 8, 2013, 6:45 pm |
|
Building Footprint- Overhanging eavesNC-2009 SSc5.1: Site development - protect or restore habitatposted by Gaston Viau on Dec 6, 2012, 2:55 pm
The roof of our project has overhanging eaves. To calculate the footprint of the building, should we consider the perimeter of the walls at ground level or the perimeter of the roof? Last reply: Lindsay Duthie, Sep 27, 2017, 2:36 pm |
|
MR4 & MR5 Credits LEED 2009 NCNC-2009 MRc4: Recycled Contentposted by Brian Harris on Jan 25, 2013, 12:18 pmwww.BCdesignbuild.com LEEDuser Premium Member 60 thumbs up January 28, 2013- 2:24 pm Brian and Joseph- I have had similar questions within this forum regarding lean fill and imported fill and was given the following... Last reply: Tim Crowley, Feb 19, 2013, 3:56 pm |
|
Submit a Low Mercury ID CreditNC-2009 IDc1: Innovation in Designposted by Joel Register on Feb 28, 2013, 3:40 pm
I would like to use the EB: MRc4-low mercury bulb credit for an ID credit in a LEED-CI project. What is the process in in submitting this as an ID credit. Do I need to submit a... Last reply: Clara Pistoni, Oct 10, 2013, 3:13 am |
|
EAc5 Measurement and Verification Option 3NC-2009 EAc5: Measurement and Verificationposted by Dan Milewski on Mar 4, 2013, 2:10 pm
Is Option 3 (1 point) - Meet MPR 6 through compliance Opttion 1: Energy and Water Data Release Form. Is option 3 available as a stand alone option or only as a exemplary performance if... Last reply: Marcus Sheffer, Jan 10, 2014, 9:29 am |