Baseline system > 70% OA based on 20 degree riseNC-2009 EAp2: Minimum Energy Performanceposted by Matt Scott on Aug 13, 2014, 5:02 pm
I have a packaged multi-zone... Last reply: Matt Scott, Aug 14, 2014, 2:59 pm |
|
Operable windowsNC-2009 IEQc6.2: Controllability of systems - thermal comfortposted by Charalampos Giannikopoulos on Jan 31, 2015, 9:01 am
For an office space with 100 individual working spaces the project team has used operable windows in order to provide thermal comfort control. 80 working spaces are located within 20 feet of a... Last reply: Larissa Oaks, Jun 27, 2016, 3:32 pm |
|
Naturally ventilated corridorsNC-2009 IEQp1: Minimum indoor air quality performanceposted by Stella Stella on Mar 23, 2015, 3:17 am
In one of our project we have a Main corridor that is completely open with just a parapet wall and roof overhang. Now we have another small corridor that is connected to this Main corridor. The... Last reply: Dave Hubka, Apr 1, 2015, 7:27 am |
|
Rounding of Percent Energy Cost Savings for EAc1 PointsNC-2009 EAc1: Optimize Energy Performanceposted by Joseph Chappell on Aug 13, 2015, 2:53 pm
Hi all, We recently received a final design review where our percent energy cost savings have been corrected by the reviewer to show 31.95%. This project is an existing building... Last reply: Christopher Schaffner, Sep 14, 2015, 10:04 am |
|
Service Hot Water & Heat recovery condensersNC-2009 EAp2: Minimum Energy Performanceposted by Vassil Vassilev on Jun 7, 2016, 7:43 am
Greetings, Last reply: Marcus Sheffer, Jun 9, 2016, 11:26 am |
|
Process LoadsNC-2009 EAp2: Minimum Energy Performanceposted by Paula Hernandez on Jul 27, 2016, 10:39 am
Hello, Last reply: Marcus Sheffer, Sep 21, 2017, 11:47 am |
|
The correct/latest 62MZ & LEED min. IAQ spreadsheet?NC-2009 IEQp1: Minimum indoor air quality performanceposted by Aru Sau on Dec 5, 2016, 11:07 am
Is "v2009v4_Minimum... Last reply: Hernando Miranda, Feb 5, 2018, 2:18 pm |
|
Kitchen FaucetsNC-2009 WEp1: Water Use Reductionposted by Angel Vega on Dec 14, 2016, 2:27 pm
The building I am trying to obtain the certification for, is a museum. It has two rooms with faucets for the cleaning staff. Are these faucets into the objetive of reduction? Last reply: Gerren Wagner, Apr 19, 2018, 4:55 pm |
|
20% Cut Sheet UploadNC-2009 MRc5: Regional Materialsposted by Denise Domino on Mar 14, 2017, 8:27 amin or register to post comments RETIRED LEEDuser Expert 622 thumbs up March 14, 2017- 11:55 am Check out the January and June 2016 updates on the LEEDuser forum- LEED Online Status Updates-... Last reply: Debra a. Lombard, Mar 29, 2017, 11:22 am |
|
Applicability of CPG sections 2.9 and 3.10CI-2009 EAc1.3: Optimize energy performance - HVACposted by Clark Denson on Feb 26, 2010, 10:08 am
Like Heather's question above, what if the equipment to be installed is less than 5 hp AND doesn't fall under the HVAC equipment categories listed in section 2.9 of the CPG, such as Variable... Last reply: John Bauer, Jul 30, 2010, 2:53 pm |