Efficiencies for System 4 – PSZ-HP (packed roof top heat pump)

NC-2009 EAc1: Optimize Energy Performance
posted by Francesco Passerini on Sep 27, 2012, 10:21 am

According to Table G3.1.1A for the baseline model I have to model System 4 – PSZ-HP (packed roof top heat pump).
I’m wondering what efficiencies I have to consider.
Shall the electric...

Last reply: Francesco Passerini, Oct 10, 2012, 6:28 am

Comprehensive Transportation Management Plan

NC-2009 SSc4.1: Alternative transportation - public transportation access
posted by Julie Blue on Oct 9, 2012, 12:00 pm

We have submitted for an Exemplary Performance ID credit by creating a transportation management plan. The review comments came back that "the project has not earned at least three SSc4 credits...

Last reply: emily reese moody, Apr 30, 2020, 2:43 pm

International project-onsite renuable energy

NC-2009 EAc6: Green Power
posted by Mahbuba Khan AIA, LEED AP BD+C on Nov 28, 2012, 6:54 pm

An industrial building client in Bangladesh wants to produce most of it's power by gas operated generator. About 10%-15% power will also be generated from solar panels and small wind turbines....

Last reply: Marcus Sheffer, Jan 8, 2013, 6:45 pm

Building Footprint- Overhanging eaves

NC-2009 SSc5.1: Site development - protect or restore habitat
posted by Gaston Viau on Dec 6, 2012, 2:55 pm

The roof of our project has overhanging eaves. To calculate the footprint of the building, should we consider the perimeter of the walls at ground level or the perimeter of the roof?

Last reply: Lindsay Duthie, Sep 27, 2017, 2:36 pm

MR4 & MR5 Credits LEED 2009 NC

NC-2009 MRc4: Recycled Content
posted by Brian Harris on Jan 25, 2013, 12:18 pm

www.BCdesignbuild.com LEEDuser Premium Member 60 thumbs up January 28, 2013- 2:24 pm Brian and Joseph- I have had similar questions within this forum regarding lean fill and imported fill and was given the following...

Last reply: Tim Crowley, Feb 19, 2013, 3:56 pm

Submit a Low Mercury ID Credit

NC-2009 IDc1: Innovation in Design
posted by Joel Register on Feb 28, 2013, 3:40 pm

I would like to use the EB: MRc4-low mercury bulb credit for an ID credit in a LEED-CI project. What is the process in in submitting this as an ID credit. Do I need to submit a...

Last reply: Clara Pistoni, Oct 10, 2013, 3:13 am

EAc5 Measurement and Verification Option 3

NC-2009 EAc5: Measurement and Verification
posted by Dan Milewski on Mar 4, 2013, 2:10 pm

Is Option 3 (1 point) - Meet MPR 6 through compliance Opttion 1: Energy and Water Data Release Form.

Is option 3 available as a stand alone option or only as a exemplary performance if...

Last reply: Marcus Sheffer, Jan 10, 2014, 9:29 am

Future-Fit Out Spaces LEED Certified or Not

NC-2009 PIf1: Minimum Program Requirements
posted by Catherine Blakemore on Mar 22, 2013, 3:41 pm

My inquiry is in reference to...

Last reply: Catherine Blakemore, May 1, 2013, 7:52 pm

LEED Interpretation Rulings-When can they be followed?

NC-2009 IEQc4.4: Low-emitting materials - composite wood and agrifiber products
posted by Judy Landwehr on Apr 1, 2013, 6:16 pm

Which of the below statements applies to a...

Last reply: Tristan Roberts, Apr 22, 2013, 4:00 pm

Green Data Center

NC-2009 EAc1: Optimize Energy Performance
posted by Jatuwat Varodompun on Apr 10, 2013, 1:23 pm

Does anyone know about the modeling baseline of the a data center. Can we use 90.1 or do we have to use something else?

Last reply: Mara Baum, May 30, 2013, 12:26 pm