Topic | Recent |
---|---|
Use (Grouped) modeled zones for Min IAQNC-v4 EQp1: Minimum indoor air quality performanceposted by RDK E&S on Nov 25, 2019, 2:20 pm
Hello, I am working on a residential project under NC-v4. The project is a residential hall with 1bd, 2bd, 3bd, and some 4bd suites. The project utilizes natural ventilation during the... |
|
Timing of water testingNC-v4 WEc3: Cooling tower water useposted by matt kaye on Dec 9, 2019, 8:15 am
Do you test the potable water anytime? or should the testing of the water be done after cooling tower start up process? |
|
Dog parks- SS2- Restore Habitat; and SS3 Open Space/Vegetated AreaNC-v4 SSc3: Open spaceposted by Paul Bierman-Lytle on Dec 24, 2019, 10:28 am
SS c2: Site Development- Protect or Restore Habitat: does a Dog Park area comply if vegetated with native or adaptive species? SS c3: Open Space - does a Dog Park qualify as Open Space;... |
|
Chilled Water rinsing / cleaning- How to ensure safe disposal?NC-v4 SSp1: Construction Activity Pollution Preventionposted by Amine Zeidane on Jan 6, 2020, 6:10 am
Hello LEED Community, I'm working on a project where, as a part of HVAC... |
|
In an open office space, how to distinguish whether the type of workstation meets the definition of permanent indoor obstructionNC-v4 EQc8: Quality Viewsposted by Jingchao Qian on Jan 8, 2020, 10:34 pm
There are questions about the quality view of open-plan office spaces. Vision types 1 and 3 require no permanent indoor obstructions. Refer to example 3 in the reference. It seems that movable... |
|
Composite Wood Evaluation- Required DocumentationNC-v4 EQc2: Low-emitting materialsposted by Allan Robles on Jan 17, 2020, 5:27 pm
Hi LEED User-verse again! I need assistance affirming my understanding (and also summarizing) the documentation requirements for meeting the composite... |
|
Calculation of FTE in WE calculator for project with different occupancy schedule for each floor.NC-v4 WEp2: Indoor water use reductionposted by Sushrut Jadhav on Jan 22, 2020, 2:07 am
The project I am working on has total FTE -103 (90 Office employees + 13 Maintenance, Cleaning, and Security). Not all the floors of the building have the same occupancy times... |
|
In multi-family residential units, can a VTAC unit provide mechanical ventilation to meet 62.1-2010?NC-v4 EQp1: Minimum indoor air quality performanceposted by Sherman Aronson on Jan 22, 2020, 5:53 pm
In multi-family residential units, can a VTAC unit provide mechanical ventilation to meet 62.1-2010? The operable windows provide natural ventilation, but ASHRAE now requires mechanical... |
|
Shared Multi-Occupant Spaces within Open Office LayoutNC-v4 EQc6: Interior lightingposted by Sarah Gudeman on Jan 27, 2020, 12:42 pm
We have a current project with open office layout (individual regularly-occupied spaces) that also includes what I would call huddle areas (shared multi-occupant spaces) distributed around... |
|
Enhanced Commissioning V4NC-v4 EAc1: Enhanced Commissioningposted by Prakash Sekar on Feb 1, 2020, 5:15 am
Can u share the sample submittal document for Enhanced Commissioning V4 |