Full Height GlazingHealthcare-v2009 IEQc8.2: Daylight and views - viewsposted by Lauren Bellamy on Jul 11, 2013, 6:48 pm
Per step 2 for noninpatient buildings and areas "for portions of the perimeter wall with full-height glazing, the qualifying area may be extended beyond the 15-foot limit to twice the head height... |
|
Industrial Flooring- Concrete Waterproofing / SealerHealthcare-v2009 IEQc4: Low-emitting materialsposted by Catherine Blakemore on Jul 26, 2013, 6:11 pm
I have an industrial flooring product that is a 3-part system (primer, waterproof membrane and topcoat (which is solid gray). It would be installed on the concrete slab of a mechanical... |
|
What was your LEED deliverable after the site assessment?Healthcare-v2009 SSp2: Environmental Site Assessmentposted by Jill DeMarotta on Aug 13, 2013, 4:10 pm
What have you provided as a deliverable for this credit? Was it the EPA's Ready for Reuse form? Our inspecting authority is not sure what to provide to appease the LEED reviewer. Thanks- |
|
Remediating to "residential (unrestricted) use"Healthcare-v2009 SSp2: Environmental Site Assessmentposted by Kathy Wislocky on Sep 12, 2013, 11:46 am
Is it feasible for a LEED HC project to meet this prerequisite without being remediated to a "residential (unrestricted) use?" After speaking with our environmental consultant, this would... |
|
VRP Compliance Calculator ErrorHealthcare-v2009 IEQp1: Minimum indoor air quality performanceposted by Kevin Chow on Oct 24, 2013, 4:07 pm
I opted to use the LEEDonline provided VRP Compliance Calculator to show compliance with the IEQ p1. Upon completion of the form it says I am not compliant. I have digitally signed the form,... |
|
Building Envelope CommissioningHealthcare-v2009 EAc3: Enhanced Commissioningposted by Kerrie Racicot on Nov 13, 2013, 8:28 am
BECx can be wide open when it comes to scope. |
|
Happy Holidays and Many Thanks...Healthcare-v2009 MRc3: Sustainably sourced materials and productsposted by Catherine Blakemore on Dec 19, 2013, 2:19 pm
Just want to wish everyone Happy Holidays and the best wishes for a fabulous 2014! Also many thanks to everyone who gives of their time to help us all. We greatly appreciate it. |
|
Applying the 0.5 gpm limit to toilets embedded in departmentsHealthcare-v2009 WEp1: Water Use Reductionposted by Kim Shinn on Jan 9, 2014, 2:50 pm
There is a discussion string under the LEED HC 2009 WEc3 credit forum about whether or not faucets in toilet rooms that are embedded in clinical departments (imaging, lab, therapy) should or... |
|
ConceptsHealthcare-v2009 WEc2: Water use reduction - measurement and verificationposted by Alicia Villanueva on Jan 15, 2014, 2:39 pm
Hallo, Due to our lack of knowledge about healthcare facilities and the handicap of translating the terms into spanish we would very much appreciate clarification regarding the following... |
|
LEED Project Boundary for a Transit StationHealthcare-v2009 MPR3: Must use a reasonable site boundaryposted by Kimberlyn Caoagas on Mar 11, 2014, 2:57 pm
BACKGROUND INFO: |