Full Height Glazing

Healthcare-v2009 IEQc8.2: Daylight and views - views
posted by Lauren Bellamy on Jul 11, 2013, 6:48 pm

Per step 2 for noninpatient buildings and areas "for portions of the perimeter wall with full-height glazing, the qualifying area may be extended beyond the 15-foot limit to twice the head height...

Industrial Flooring- Concrete Waterproofing / Sealer

Healthcare-v2009 IEQc4: Low-emitting materials
posted by Catherine Blakemore on Jul 26, 2013, 6:11 pm

I have an industrial flooring product that is a 3-part system (primer, waterproof membrane and topcoat (which is solid gray).

It would be installed on the concrete slab of a mechanical...

What was your LEED deliverable after the site assessment?

Healthcare-v2009 SSp2: Environmental Site Assessment
posted by Jill DeMarotta on Aug 13, 2013, 4:10 pm

What have you provided as a deliverable for this credit? Was it the EPA's Ready for Reuse form? Our inspecting authority is not sure what to provide to appease the LEED reviewer. Thanks-

Remediating to "residential (unrestricted) use"

Healthcare-v2009 SSp2: Environmental Site Assessment
posted by Kathy Wislocky on Sep 12, 2013, 11:46 am

Is it feasible for a LEED HC project to meet this prerequisite without being remediated to a "residential (unrestricted) use?"

After speaking with our environmental consultant, this would...

VRP Compliance Calculator Error

Healthcare-v2009 IEQp1: Minimum indoor air quality performance
posted by Kevin Chow on Oct 24, 2013, 4:07 pm

I opted to use the LEEDonline provided VRP Compliance Calculator to show compliance with the IEQ p1. Upon completion of the form it says I am not compliant. I have digitally signed the form,...

Building Envelope Commissioning

Healthcare-v2009 EAc3: Enhanced Commissioning
posted by Kerrie Racicot on Nov 13, 2013, 8:28 am

BECx can be wide open when it comes to scope.
Is there some guidance regarding the scope that LEED is looking for?
Thank you,

Happy Holidays and Many Thanks...

Healthcare-v2009 MRc3: Sustainably sourced materials and products
posted by Catherine Blakemore on Dec 19, 2013, 2:19 pm

Just want to wish everyone Happy Holidays and the best wishes for a fabulous 2014! Also many thanks to everyone who gives of their time to help us all. We greatly appreciate it.

Applying the 0.5 gpm limit to toilets embedded in departments

Healthcare-v2009 WEp1: Water Use Reduction
posted by Kim Shinn on Jan 9, 2014, 2:50 pm

There is a discussion string under the LEED HC 2009 WEc3 credit forum about whether or not faucets in toilet rooms that are embedded in clinical departments (imaging, lab, therapy) should or...

Concepts

Healthcare-v2009 WEc2: Water use reduction - measurement and verification
posted by Alicia Villanueva on Jan 15, 2014, 2:39 pm

Hallo,

Due to our lack of knowledge about healthcare facilities and the handicap of translating the terms into spanish we would very much appreciate clarification regarding the following...

LEED Project Boundary for a Transit Station

Healthcare-v2009 MPR3: Must use a reasonable site boundary
posted by Kimberlyn Caoagas on Mar 11, 2014, 2:57 pm

BACKGROUND INFO:
- Attempting LEED EB: O&M Certification for a historical train/transit station
- The first floor of the station has an opening/threshold (no enclosures) that...