Ownership of Attributes: On-Site PV with Utility Program
NC-v4.1 EAc5:Renewable Energyposted by Summer Minchew on
The LEEDonline form for this credit requires us to, "Upload On-site Renewable Energy Systems...Contract and evidence of renewable attribute ownership.
Soil Testing
NC-v4.1 SSc2:Protect or Restore Habitatposted by Max Krueger on
On page 49 of the LEEDv4.1 guide it states that soil testing is only needed on imported soils. Under Step-by-Step guidance, it states "Soil tests are only required for imported soils".
Soil tests no longer required?
NC-v4.1 SSc2:Protect or Restore Habitatposted by Petra Holoubkova on
Hello,
Regd. Peak Cooling Load in Baseline Model for Chiller Sizing
NC-v4 EAc2:Optimize energy performanceposted by Anurag Ghosh on
I have a general doubt regarding peak cooling load which is to be taken in baseline case for sizing the chillers. We generally model the base case for any building in Design Builder.
Occupant usage of tenant fixtures is less than 100%
CI-v4 WEp1:Indoor water use reductionposted by Nadia Azzam on
We are working on a tenant fit-out for a specialty group occupying the entire 3rd floor and part of the 1st floor in a LEED-certified building.
Pilot Comprehensive Composting sspc 129
CI-v4 INc1:Innovationposted by Laurie Johnson on
I am working on the the above Pilot credit using Option 1 Regular Compost Collection and Offste Processing. The client has chosen to work with the company CompostNow as there is no
Baseline Building Information not availiable
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi, I am working on LEED ID+C project in which we do not have any info regarding COP of chiller, Fan Flow, Fan power, Pump power etc. So what should I do to input that?
Water Metering for LEED Group: Single Meter for 3 Buildings?
NC-v4 WEp3:Building-level water meteringposted by Mike Refsland on
I'm working on a project pursuing LEED v4 Group, New Construction, with 3 separate buildings in the LEED Group.