Ownership of Attributes: On-Site PV with Utility Program

NC-v4.1 EAc5:Renewable Energy
posted by  Summer Minchew  on 

The LEEDonline form for this credit requires us to, "Upload On-site Renewable Energy Systems...Contract and evidence of renewable attribute ownership.

3
Vice President
Moseley Architects
LEEDuser Premium Member
10 thumbs up
Mon Jan 27, 2025, 10:15 pm
2
Sustainability specialist
Skanska Sweden
LEEDuser Basic Member
205 thumbs up
Mon Jan 27, 2025, 10:41 am

Soil Testing

NC-v4.1 SSc2:Protect or Restore Habitat
posted by  Max Krueger  on 

On page 49 of the LEEDv4.1 guide it states that soil testing is only needed on imported soils. Under Step-by-Step guidance, it states "Soil tests are only required for imported soils".

6
Managing Partner
Ecoimpact Consulting
LEEDuser Expert
171 thumbs up
Fri Jan 24, 2025, 4:23 pm
7
Principal
Hellmuth & Bicknese Architects
LEEDuser Premium Member
20 thumbs up
Fri Jan 24, 2025, 2:03 pm

Regd. Peak Cooling Load in Baseline Model for Chiller Sizing

NC-v4 EAc2:Optimize energy performance
posted by  Anurag Ghosh  on 

I have a general doubt regarding peak cooling load which is to be taken in baseline case for sizing the chillers. We generally model the base case for any building in Design Builder. 

1
Fri Feb 21, 2025, 3:51 pm

Occupant usage of tenant fixtures is less than 100%

CI-v4 WEp1:Indoor water use reduction
posted by  Nadia Azzam  on 

We are working on a tenant fit-out for a specialty group occupying the entire 3rd floor and part of the 1st floor in a LEED-certified building.

1
Fri Feb 14, 2025, 3:18 am

Pilot Comprehensive Composting sspc 129

CI-v4 INc1:Innovation
posted by  Laurie Johnson  on 

I am working on the the above Pilot credit using Option 1 Regular Compost Collection and Offste Processing.   The client has chosen to work with the company CompostNow as there is no

3
Thu Jan 23, 2025, 4:11 pm

Baseline Building Information not availiable

NC-v4 EAp2:Minimum energy performance
posted by  Rajat Wadhwa  on 

Hi, I am working on LEED ID+C project in which we do not have any info regarding COP of chiller, Fan Flow, Fan power, Pump power etc. So what should I do to input that?

1
Mon Jan 27, 2025, 10:22 pm

Water Metering for LEED Group: Single Meter for 3 Buildings?

NC-v4 WEp3:Building-level water metering
posted by  Mike Refsland  on 

I'm working on a project pursuing LEED v4 Group, New Construction, with 3 separate buildings in the LEED Group.

4
Default Avatar
Drew George & Partners
LEEDuser Premium Member
4 thumbs up
Wed Jan 22, 2025, 8:54 pm