Indoor unit power calculationNC-2009 EAp2: Minimum Energy Performanceposted by SSN Energy Model on Nov 21, 2017, 9:09 am
Hi, I am doing Energy Model for car showroom which is LEED Gold Rating. Proposed HVAC System is Packaged Units and Split units. I have received the EER, Total Cooling capacity, sensible... Last reply: Marcus Sheffer, Nov 21, 2017, 1:33 pm |
|
Parking Garage (VFD with CO sensor) exceptional calculation MethodNC-2009 EAp2: Minimum Energy Performanceposted by Manivel Natarajan on Nov 13, 2017, 4:35 am
Hi Team, Greetings! The project has propsoed one of the... Last reply: Chilufya Lombe, Nov 14, 2017, 2:30 am |
|
How many points can be claimed if project is served with 100% Renewable Energy for EAC1?NC-v4 EAc2: Optimize Energy Performanceposted by Ashraf Ali Khan Khan on Nov 9, 2017, 11:23 am
How many points can be claimed if project is served with 100% Renewable Energy? For LEED V4 NC, we need to demonstrate 5% of Energy Savings compared to ASHRAE Baseline through Energy... Last reply: Marcus Sheffer, Nov 10, 2017, 1:35 pm |
|
The parking is Under the buildingNC-v4 SSc5: Heat Island Reductionposted by Radwa Amin on Feb 10, 2015, 10:05 am
Hi, My question is about the parking roof; in our case the roof shall be the "ground floor" and won't... Last reply: Kimberly Schlaepfer, Nov 3, 2017, 3:50 pm |
|
LEED V2009 NC- DES Option 1 in Energy ModelNC-2009 EAp2: Minimum Energy Performanceposted by SSN Energy Model on Oct 19, 2017, 7:02 am
Hi, I am doing the Energy Model for G+5 Floors Office building. The total conditioned area is 90,500 Sq ft. The project is connected with District Cooling Plant and have opted the option 1... Last reply: Marcus Sheffer, Oct 19, 2017, 10:58 am |
|
LEED CS V4 Design of Snow parkCS-v4 EAp2: Minimum Energy Performanceposted by Shahana Sayed on Oct 16, 2017, 7:55 am
What should be the EAp2 baseline consideration for snow park/ski park within a mall in UAE. Last reply: Marcus Sheffer, Oct 18, 2017, 10:31 am |
|
Expiration date on Green Label PlusCS-2009 IEQc4.3: Low-emitting materials - flooring systemsposted by Lise Dannesboe on Oct 12, 2017, 11:32 am
Hi. Is there a requirement to the expiration date of the certification? We just recevied a carpet with a Green Label plus certificate, which has an expiration date on the 31of decmeber 2017. Can... Last reply: Kristina Bach, Oct 12, 2017, 12:17 pm |
|
CS v2009 ventilation need for each spaceCS-2009 IEQp1: Minimum indoor air quality performanceposted by MERVE AYGENC on Oct 2, 2017, 9:10 am
Does each space need to achieve the airflow suggested by ASHRAE separately or do we considered the overall achievement while using Minimum IEQ Performance Calculator? Last reply: Gustavo De las Heras Izquierdo, Oct 2, 2017, 6:08 pm |
|
opaque building envelope constructionNC-v4 EAp2: Minimum Energy Performanceposted by Ahmed El-Semary on Sep 12, 2017, 11:00 am
i need to know what is required to be filled exactly in roof construction and whatis meant by building ID ?? do you mean that i should enter all the zones below the roof and whether if it... Last reply: Marcus Sheffer, Sep 18, 2017, 9:25 am |
|
Mechanical Equipment FinishesNC-v4 EQc2: Low-emitting materialsposted by Samer Alhmdan on Aug 7, 2017, 6:24 am
Hello, Does this credit apply to the Mechanical Equipment Finishes ( Flooring, and Walling) for example Lifts finishes. Last reply: Ashwini Arun, Sep 12, 2017, 1:48 pm |