Holes and vents modelling in BaselineNC-2009 EAc1: Optimize Energy Performanceposted by Santiago Zarate on Dec 15, 2020, 11:38 am
We are certifying a project located in a city in Colombia with a tropical climate with average temperatures above 23°C all year round. The project takes advantage of this temperature and only... |
|
Indoor Air Quality Compliance- LEED 2009 / LEED v4.1NC-2009 IEQc4.3: Low-emitting materials - flooring systemsposted by MARK BAUER on Mar 17, 2021, 7:06 am
Hi, We have been asked to demonstrate that our product (a vinyl floor covering) is in compliance with requirement.One path to compliance is to meet testing requirements of CDPH Standard... |
|
Enamel ClassificationNC-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Alexia Anastassiadis on Apr 29, 2021, 12:20 pm
Hi all! Our project is outside the US in a non-english speaking country. Which is why we have a hard time translating paint types into their corresponding classification. How would you... |
|
LPG Gas Connection and Usage in the LEED certified building.NC-2009 EAc3: Enhanced Commissioningposted by Selvam C on Apr 30, 2021, 12:14 am
Dear Team, Greeting to everyone, We need to understand about the LEED process and procedure / guidelines of the LPG Gas or Cooking Gas services and usage for the LEED certified... |
|
Lines of sight- How toNC-2009 IEQc8.2: Daylight and views - viewsposted by Simone Bevilacqua on Aug 5, 2021, 4:15 pm
Our company is in charge of validating an office building compliance with credit IEQc8.2 - Views, under LEED2009 V3. The building floorplate is shaped as a rectangle that repeats itself... |
|
Guestroom Closets and Bathrooms- Non-Regularly Occupied?NC-2009 IEQc8.2: Daylight and views - viewsposted by Kevin Mowatt on Sep 8, 2021, 5:28 pm
USGBC's IEQ v2009 Space Matrix indicates that Guestrooms (in their entirety) should be considered Regularly Occupied. When creating the Views plan diagrams, we are finding of course that certain... |
|
Innovation: Low Mercury Lamping and Innovation: Purchasing- Lamping (OM v4 MR Credit)NC-2009 IDc1: Innovation in Designposted by Bonny Gray on Sep 22, 2021, 12:26 pm
We have earned credits for Innovation points Low Mercury Lamping and Purchasing - Lamping, however not on the same project. Can both of these Innovation points be used on the same project to... |
|
ConcreteNC-2009 MRc5: Regional Materialsposted by Steve Willey on Jan 13, 2022, 3:54 pm
Is there anyway to calculate for cost per pound for cement, fly ash, limestone and sand |
|
ConcreteNC-2009 MRc5: Regional Materialsposted by Steve Willey on Jan 17, 2022, 10:52 am
Is there such a thing as a Regional Material Calculation for concrete. |
|
Use of Supplemental fans for Building flush outNC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by John Covello on Apr 7, 2022, 4:14 pm
Hello, Our contractor wants to use supplemental industrial floor fans to shorten the flush out time for a project. They are not sure how the fans are placed and used for the flush... |