time delay in fit out

General forums
posted by Tristan Roberts on Mar 22, 2011, 11:37 am

Sonia, I don't see an issue with this. As long as you define the project scope as encompassing all the work you describe, and you are able to collect all the needed documentation and meet...

Last reply: Tristan Roberts, Mar 25, 2011, 12:49 pm

Finish Grading, Seeding and Plantings- applicable for MRc5?

NC-2009 MRc5: Regional Materials
posted by Renee Shirey on Mar 15, 2011, 11:44 am

In the Resource book on page 383 and 385 I see tables that have "plant material" as one of the regional items, but I am confused by the language in the actual credit - "BUILDING materials or...

Last reply: Tristan Roberts, Mar 25, 2011, 12:43 pm

Biomass Boiler

NC-2009 EAc2: On-Site Renewable Energy
posted by sara frye on Mar 21, 2011, 11:54 am

Our project, a small non-profit farm house renovation, is using a...

Last reply: Tristan Roberts, Mar 25, 2011, 12:09 pm

EQ6.2 Return air flow

LEED for Homes (LEED-H) Forum
posted by mike diess on Feb 1, 2011, 11:25 am

EQ6.2 a) states:"Size the opening to 1 sq inch per cfm of supply air (this area may include free area undercut below door)." When using a grille are they specifying gross or net area? Our firm...

Last reply: Rob Moody, Mar 24, 2011, 8:02 pm

Roof with solar panels

EBOM-2009 SSc7.2: Heat island effect - roof
posted by Matthew Perna on Dec 30, 2010, 9:08 am

Does anyone know why a roof covered with solar panels wouldn't apply to credit 7.2: Heat Island Reduction--Roof? The USGBC allows it to be used toward credit 7.1 where a roof with solar panels...

Last reply: David Posada, Mar 24, 2011, 12:41 pm

Guadua

NC-2009 MRc6: Rapidly Renewable Materials
posted by Carlos Alberto Hoyos Soto on Mar 24, 2011, 10:23 am

I want to know if anyone has use guadua, and if it is considered as rapidly renewable material, thanks.

Last reply: Tristan Roberts, Mar 24, 2011, 11:30 am

Innovative water efficiency

EBOM-2009 IOc1: Innovation in Operations
posted by Melissa Merryweather on Mar 24, 2011, 12:00 am

A project considering LEED...

Last reply: David Hubka, Mar 24, 2011, 7:58 am

Two fan systems on a common supply riser

EBOM-2009 IEQp1: Minimum indoor air quality performance
posted by Dave Munn on Dec 4, 2009, 2:30 pm

We are working on a building with a supply fan both at the top of a common supply duct riser (penthouse) and another supply fan in the lower level connected to the base of the common riser. Both...

Last reply: Jalal Avades, Mar 24, 2011, 1:47 am

Multiple AHUs serving a single space

EBOM-2009 IEQp1: Minimum indoor air quality performance
posted by Zachary Goodnough on Feb 23, 2011, 1:47 am

The building I am working on has a large main sales area which is served by 8 AHUs, all bringing in 100% fresh air. In this case, is the proper protocol to first divide total peak customer and...

Last reply: Zachary Goodnough, Mar 23, 2011, 11:07 pm

Applicability of Pilot Credits

Using the LEED Pilot Credit Library
posted by Abena Darden on Mar 18, 2011, 5:55 pm

Tristan-We've just registered for Pilot Credit 11 in a LEED for Homes project but I notice on the applicability table above this credit cannot be used for Homes. Is this a hard and fast USGBC...

Last reply: Batya Metalitz, Mar 23, 2011, 5:19 pm