Topic | Recent |
---|---|
Is it too late to do SSp1?NC-2009 SSp1: Construction Activity Pollution Preventionposted by Indochine Engineering VN on Mar 15, 2016, 4:52 am
Hi, My project is a hotel and client just decided to do LEED when Construction of... |
|
n/aNC-2009 SSc6.1: Stormwater design - quantity controlposted by Marco Valerio Ceccotti on Mar 21, 2016, 1:16 pm
Hi All. This is just a suggestion. To achieving this credit the pre-development condition is no more the "existing site" we were talking about in v2009, but is now(LEED v4) the "... |
|
All water reduction through recyclingNC-2009 WEc3: Water Use Reductionposted by Melissa Merryweather on Mar 23, 2016, 7:04 am
I'm just curious if anyone has experience not even achieving the basic 20% reduction with the sanitary ware, but then achieving innovation points on both WEc2 and WEc3 (and of course the regional... |
|
n/aNC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Anastasia Makarenko on Mar 31, 2016, 12:30 pm
Dear all, |
|
n/aNC-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Donna Juselis on Apr 8, 2016, 5:59 pm
deleted |
|
WastewaterNC-2009 WEc3: Water Use Reductionposted by Alejandro Macias on Apr 11, 2016, 5:54 pm
I m using the "water use reductions calculator" to document the WEp1 and WEc3. But in the project im working we will be reusing waste water for the WC and urinal flushing. How can I document the... |
|
Sediment trap outside the project boundaryNC-2009 SSp1: Construction Activity Pollution Preventionposted by Gabriela Mesquita on Apr 13, 2016, 11:22 pm
It plans to build a building in a very broad field of the same owner. The LEED Boundary was defined based on the area that is planned to disrupt. There is a pond of water accumulation built many... |
|
LEED user Assembly Calculator for Certified WoodNC-2009 MRc7: Certified Woodposted by Esther Kohout on Apr 15, 2016, 3:45 pm
Still confused on... |
|
EAC4 Enhanced Refrigerant ManagementNC-2009 EAc4: Enhanced Refrigerant Managementposted by Sahar Al-Khairi on Apr 20, 2016, 7:55 am
In a project I'm working on , we are using two heat pumps for cooling and heating,such that only one heat pump is going to be used during the summer season(cooling) and both pumps are to be used... |
|
CCHP System modelingNC-2009 EAp2: Minimum Energy Performanceposted by Jie Shen on Apr 20, 2016, 10:07 pm
My project is provided by CCHP system which owned by third party, the CCHP has two gas generators, one heat recovered gas absorption chiller, two normal chillers and two boilers. |