Log in
Forum
Topic

IAQ Flush out-using temporary exhaust systems

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Stella Stella on Aug 8, 2014, 3:54 am

Hi,
We are proposing a...

LEED NC 2009 for factory building

NC-2009 EAp2: Minimum Energy Performance
posted by Rathnashree Bharadwaj on Aug 12, 2014, 5:37 am

The project is a manufacturing facility. The main production block has other adjacent buildings such as admin, canteen, health center, utility and security blocks. All the blocks are independent...

Horse Riding Arena

NC-2009 WEc3: Water Use Reduction
posted by Kavita Karmarkar on Aug 13, 2014, 4:46 pm

Is the water used for bathing horses in a horse riding centre to be included in the water use reduction calculations? If yes, then is it to be under the showers category???

ventilation through docks

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Alicja Bieszyńska on Aug 14, 2014, 7:22 am

Hi all,

I'm working on a distribution center project that intakes the air by docks and exhusts it through fans in the roof. Is it natural or mechanical ventilation?

Another question...

Please update checklist above

NC-2009 IEQc1: Outdoor Air Delivery Monitoring
posted by Lyle Axelarris on Aug 19, 2014, 3:53 pm

The "Document credit compliance on LEED Online" portion of the checklist provided above needs to be corrected to avoid further confusion.
1. References to ASHRAE 62.1 and OA ventilation...

FTE calculation for a Dorm

NC-2009 PIf3: Occupant and Usage Data
posted by Nelina Loiselle on Aug 19, 2014, 5:19 pm

How would we calculate...

Outdoor air requirements in corridors

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Ricardo Sá on Aug 20, 2014, 7:41 am

I' m currently working on a school project where most of the corridors have an exhaust system, that induces make-up air from the adjacent classrooms and (eventually negligible) infiltrated air...

Another "is it a roof or is it hardscape" inquiry

NC-2009 SSc7.2: Heat island effect - roof
posted by Susan Di Giulio on Aug 20, 2014, 4:45 pm

We are working on a mixed use project in a dense urban environment. It will contain one tower with hotel, other hospitality and entertainment functions topped by many floors of condos, two all-...

Recirculated Air

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Emmanuel Pauwels on Aug 25, 2014, 6:52 am

We are working on a small building that will operates for conferences and private events.
There will be a kitchenette or coffee point (only microwave, coffe maker and refrigerator). The...

ETo units and ETo calculation software

NC-2009 WEc1: Water Efficient Landscaping
posted by Renaud Gay on Aug 26, 2014, 12:08 am

Hi all,

I'd like to ask again the same question that in LEED form ETo is expressed in inch/month for July. This is not super clear but looks like this.

Also for people like me who...