Circulation space around the building coreCS-v4 EQc4: Daylightposted by Julien Richard on Nov 25, 2015, 4:52 am
For Core&Shell projects, the reference guide specifies : “Assume that the entire floor plate, except for the core, will be regularly occupied space “. |
|
Option 3-Approach 2 Commuter Survey- representative selectionEBOM-2009 SSc4: Alternative Commuting Transportationposted by Christian Bösselmann on Oct 22, 2015, 4:32 am
In conducting the commuter survey according to Option 3 / Approach 2 I am would very much appreciate your feedback on the following topics. The multifunctional building is occupied by 1250... Last reply: Christian Bösselmann, Nov 24, 2015, 3:19 am |
|
Global Compliance Paths ASHRAE 62.1 & EN 15251 and EN 13779NC-2009 IEQp1: Minimum indoor air quality performanceposted by Ian McCall on Nov 17, 2015, 12:46 pm
Dear All, Question : Last reply: Devani PERERA, Nov 19, 2015, 3:23 am |
|
Tools and flexibilityPilot-Credits MRpc63: Whole building life cycle assessmentposted by Devani PERERA on Nov 13, 2015, 7:23 am
There are secral tools that can be used for LCA but it appears that some tools are more detailed than others. In europe the calculation methods seems to go into great detail. I think its great... |
|
short term bicycle racks for foreign visitorsNC-v4 LTc6: Bicycle facilitiesposted by Jade Deltour on Oct 22, 2015, 6:22 amrestaurant and conference facilities. We are considering visitors to the conference centre and restaurants in our cycle provision; however, based on previous discussions on this forum, I understand excluding... Last reply: Kimberly Schlaepfer, Nov 9, 2015, 2:40 pm |
|
EQ PC 57- French feedbackCS-2009 IDc1: Innovation in Designposted by Elodie DUMAS on Nov 4, 2015, 10:32 am
Dear all, A short feedback about our experience concerning EQ PC 57 use, for an office tower project in France (Marseille) under LEED CS V3. |
|
Definition of street frontagePilot-Credits PC14: Walkable Streetsposted by Florian Schmidtchen on Sep 30, 2015, 4:41 am
What is the right definition of street frontage? In our project we have the site surrounded by streets on three sides, but on all three sides there are public sidewalks and green areas with trees... |
|
Checking oh IAQ management plan during constructionNC-2009 IEQc3.1: Construction IAQ management plan - during constructionposted by Caroline PIN on Sep 16, 2015, 12:03 pmMichelle Halle Stern LEED Fellow The Green Facilitator LEEDuser Premium Member 117 thumbs up September 16, 2015- 1:47 pm More than enough photos if that show the requested information. There are a number of posts on the subject in this forum if you search "photo" From the form: Option 1 Upload. Photographs documenting construction and pre-occupancy phase moisture protection methods, for absorptive materials, have been provided. Upload IEQc3.1-2. Provide photos documenting methods employed to protect absorptive materials from moisture damage during construction and pre-occupancy. Photos should... Last reply: Caroline PIN, Sep 17, 2015, 4:23 am |
|
SS PC27- a short feedbackCS-2009 IDc1: Innovation in Designposted by Elodie DUMAS on Sep 10, 2015, 2:53 pm
Dear all, A short feedback about our experience concerning LEED SS PC 27 use for a major refurbishment office project in France, under LEED for Core an Shell version 3. This Pilot... |
|
Assembly Calculator for Materials with Recycled ContentNC-2009 MRc4: Recycled Contentposted by Caroline PIN on Aug 27, 2015, 2:06 pm
Dear all, Last reply: Caroline PIN, Sep 2, 2015, 1:33 pm |