Log in
Forum
Topic

Credit Calculation Options

Schools-2009 IEQp3: Minimum Acoustical Performance
posted by Tim Hoeft on Dec 13, 2010, 8:47 pm

Our project's classrooms are all less than 20k cu.ft. and have "clouds" of acoustical ceiling tile (approx. 60% ceiling area) and either drywall soffit (approx 5%) or areas open to structural bar...

Last reply: Dana Murdoch, Jul 26, 2011, 6:07 pm

Total Cost of Materials

NC-2009 MRc4: Recycled Content
posted by J Morrison on Jul 11, 2011, 12:01 pm

The LEED Online format for submitting the MR credit 4, 5, and 7 it asks for the "Cost per Item" and "Number of Items Purchased". I have to total cost of the items, but not the individual cost....

Last reply: Susan Walter, Jul 26, 2011, 5:14 pm

Greenhouse

Schools-2009 EAc1: Optimize Energy Performance
posted by Lisa Logan on Jul 26, 2011, 12:40 pm

Client is adding greenhouse to the school project - sort of late in the game. Does this space get included in our energy calcs? I am assuming yes and that there is no way around it.

Last reply: Marcus Sheffer, Jul 26, 2011, 5:03 pm

Signage Details?

NC-2009 SSc4.4: Alternative transportation - parking capacity
posted by Marketing Coordinator on Jun 1, 2011, 1:52 pm

Hi, I'm working on a LEED 2009 for Schools project and just rec'd my Design review comments. One of the comments was to "provide signage details to document how the spaces will be dedicated as...

Last reply: Curt Pascoe, Jul 26, 2011, 3:04 pm

Heat sensors to control HVAC

Schools-2009 EAc1: Optimize Energy Performance
posted by Gendel Metlitsky on Jun 13, 2011, 12:08 pm

On May, 26 I was listening to webinar regarding Richardsville NEZ school presented by Joanie Hendricks, Public Relations Coordinator from Warren County PS, Tim Murley Superintendent WCPS, Kenny...

Last reply: Marcus Sheffer, Jul 26, 2011, 1:44 pm

PIEACP compliance path

Schools-2009 IEQc4.3: Low-Emitting Materials—Flooring Systems
posted by Peter Doo on Jun 13, 2011, 10:00 am

If we are using the PIEACP compliance path for this credit, the NC 2.2 Credit 4.3 refers only to carpet systems. Does this mean that other flooring systems, such as terrazzo for example, would be...

Last reply: Lauren Sparandara, Jul 25, 2011, 8:38 pm

Daylighting

CI-2009 IEQc6.1: Controllability of systems - lighting
posted by Sam Keehn on Jul 13, 2011, 6:35 am

Daylighting is mentioned as a method for meeting the credit requirement of a lighting control. Our project is an open plan with a small number of work stations all within 20 feet of the window...

Last reply: Lauren Sparandara, Jul 25, 2011, 8:29 pm

What about shared Multi-Occupant spaces that are not classrooms?

Schools-2009 IEQc6.1: Controllability of systems - lighting
posted by Grace Heicher on Jun 29, 2011, 3:33 pm

Following Case 1, the LEED Reference Guide requires individual lighting controls in spaces occupied by individuals, and also adjustable controls for all learning spaces. What about shared multi-...

Last reply: Lauren Sparandara, Jul 25, 2011, 8:12 pm

Can a restaurant achieve this credit?

NC-2009 IEQc6.1: Controllability of systems - lighting
posted by Wendy Shindledecker on May 27, 2011, 12:36 pm

I'm starting a new project on a bar and grill this is seeking LEED silver. I'm a little confused on how a restaurant would achieve this credit. The health department requires the kithen to have a...

Last reply: Lauren Sparandara, Jul 25, 2011, 8:07 pm

third-party verification of landfill diversion docs (re-post)

NC-2009 MRc2: Construction Waste Management
posted by Jeff Jones on Jul 12, 2011, 2:30 pm

I am considering submitting a Pilot LEED Credit for verifying (or certifying) the actual recycling of building waste materials, whether it is from construction or an...

Last reply: Bradley Guy, Jul 25, 2011, 7:11 pm