Topic | Recent |
---|---|
understanding the Daylight Factor methodCI-2009 IEQc8.1: Daylight and views - daylightposted by Alex Warburton on Jan 9, 2010, 1:38 pm
In the CI reference manual the calculation for Daylight factor is as follows: Last reply: Tristan Roberts, Jan 12, 2010, 5:09 pm |
|
Calculations for SSc6.1NC-2009 SSc6.1: Stormwater design - quantity controlposted by Gregory Hurst on Jan 10, 2010, 6:42 pm
Calculation of a 2-year, 24 hour storm is a lengthy process. See my comments above on this issue. Rainfall amounts, especially for one year, will not provide you with a 2-year, 24 hour storm... |
|
VOC TestingNC-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Al Tibbs on Jan 6, 2010, 5:01 pm
I would not recommend a pid simply becauseit does not identify specific contaminants. I would use a Summa Canister for a more detailed and accurate analysis.... |
|
calculation of Cr 6.1 Stormwater design-Quantity ControlNC-2009 SSc6.1: Stormwater design - quantity controlposted by Gregory Hurst on Jan 5, 2010, 4:00 pm
Your calculations are correct. You will have to develop strategies to infiltrate, evapotranspire, or... Last reply: JP Rout, Jan 6, 2010, 4:03 am |
|
USGBC provides additional guidanceCI-2009 WEp1: Water Use Reductionposted by Shannon Gray on Dec 3, 2009, 12:08 pm
The USGBC just posted a new document providing additional guidance on WEp1 and WEc3. This document covers fixture groups, daily use calcs, dual flush flow rates, and autocontrol faucets. Link... Last reply: Devon Bertram, Jan 5, 2010, 3:33 pm |
|
The Naming of Options, and Knowing Which Applies to YouEBOM-2009 EAc1: Optimize Energy Efficiency Performanceposted by Jenny Carney on Jan 5, 2010, 3:08 pm
I just received an email with this question: "How do you know which calculator to use when trying to figure out the National Average. Your helpful hints indicate to use either calculator C or B.... |
|
Irrigation of playing field in a soccer stadiumNC-2009 WEc1: Water Efficient Landscapingposted by WAGNER OLIVEIRA SILVA on Dec 11, 2009, 8:57 am
Concerning credit WEc1.1 and 1.2, there are some circumstances where it is unclear whether the water used for watering must be considered as irrigation water per intent of the credit or process... Last reply: Shannon Gray , Jan 4, 2010, 12:07 pm |
|
EBOM 2008 VS EBOM 2009EBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Mary Davidge on Dec 23, 2009, 8:28 pm
Is there any real disadvantage to moving a project to LEED... Last reply: Jenny Carney, Dec 29, 2009, 12:10 pm |
|
Rock BallastingEBOM-2009 MRc9: Solid waste management - facility alterations and additionsposted by Chris Munn on Dec 28, 2009, 4:51 pm
If removing the rocks from a ballasted roof to coat the roof with an ENERGY STAR "cool roof", can these rock qualify for MR Cr9 as a material to be reused from a facility alteration? Last reply: Jenny Carney, Dec 28, 2009, 5:11 pm |
|
Blowdown water for irrigation?NC-2009 WEc1: Water Efficient Landscapingposted by Tristan Roberts on Dec 28, 2009, 1:55 pm
Overheard in an exchange about the possible use of... |