Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Baseline HVAC Model System-8 VAV PFP Boxes with Outdoor Air Unit

NC-2009 EAp2:Minimum Energy Performance
posted by  Ivan Priatman  on 

Dear LEED, We are designing a medical office with VRF system, to fulfill iaq requirements we add independent outdoor air unit comprises of supply and exhaust fans on each zone.

9
Senior Designer
PT. Archimetric
LEEDuser Basic Member
4 thumbs up
Fri Mar 27, 2015, 10:02 am

Minimum Ventilation rates for Production area

NC-2009 IEQp1:Minimum IAQ Performance
posted by  sriram tetali  on 

Hi all Can u suggest the Ventilation rates for the Production / manufacturing areas for a Pharmaceutical clients because ASHRAE doesn't mention any for the Production in the Table 6-1

3
Manager -Sustainability Services
M W Group
LEEDuser Basic Member
1 thumbs up
Fri Mar 27, 2015, 7:01 am

Hello,
I am documenting this

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Michael Russo  on 

Hello, I am documenting this credit using the simulation method. For many of the regularly occupied spaces, the rooms are above the 10fc requirement except for a small corner of the room.

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Thu Mar 26, 2015, 11:00 pm

Healthcare MRc4.1: rated hours for lamps or ballasts?

Healthcare-v2009 MRc4.1:PBT source reduction - mercury in lamps
posted by  Megan Shelby  on 

For LEED-Healthcare MRc4.1, can you confirm that the rated hours criteria is for the lamp or the ballast?

2
Principal
Schuler Shook
LEEDuser Basic Member
0 thumbs up
Thu Mar 26, 2015, 9:17 pm

Duration for online survey

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Jessica Hawley  on 

We are planning on sending out an emailed link to an online electronic transportation survey on a Monday to survey our building's entire tenant population about their commute for the prior week (M-

3
Default Avatar
Real Estate Sustainability Professional
LEEDuser Basic Member
0 thumbs up
Thu Mar 26, 2015, 9:09 pm

Is EAc2 affected by the use of the ACP calculation for EAc1?

CS-2009 EAc2:On-site Renewable Energy
posted by  Charlie Christenson  on 

Working on a core & shell project that is planning to install a PV system sized to offset 1% of total building energy cost.

3
Thu Mar 26, 2015, 7:05 pm
11
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4452 thumbs up
Thu Mar 26, 2015, 3:25 pm

VOC limits for the welding of PP-R

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Panupant Phapant  on 

Dear All Our project uses PP-R pipe (Polypropylene Random Copolymer) for chilled water piping. The PP-R pipes is connected together by welding.

3
Default Avatar
SCG Cement - Building Materials
LEEDuser Basic Member
13 thumbs up
Thu Mar 26, 2015, 11:19 am

A site with large building footprint

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Magda Aghababyan  on 

Hello, Mine is a greenfield site that has a building footprint that takes almost the entire land.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Mar 26, 2015, 3:52 am

Point Structure For MRc5

NC-2009 MRc5:Regional Materials
posted by  Robert Sherlock  on 

Has the point structure for this credit changed from 10% - 20% to 20% - 30%

3
Default Avatar
Western Industrial Contractors Ltd
LEEDuser Basic Member
0 thumbs up
Thu Mar 26, 2015, 2:49 am