Should I consider in this Prerequisite also the Restrooms?NC-2009 IEQp1: Minimum indoor air quality performanceposted by Claudia Rieger on Jul 8, 2010, 2:07 pm
Hi everybody, Now, let´s go to the question, I have a single... Last reply: Carrie Lai, Jul 22, 2010, 10:43 pm |
|
Rated PowerCI-2009 EAc1.4: Optimize energy performance - equipment and appliancesposted by Victoria Lockhart on May 18, 2010, 9:48 am
not sure if im understanding the Reference Guide correctly: for the calculation do we use the default values for... Last reply: Paul Conrad, Jul 22, 2010, 11:17 am |
|
Air Testing CriteriaNC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Vivian Wan on Jul 22, 2010, 2:29 am
Is there any guideline to the sampling criteria such as the measurement interval during the normal occupied hours? In Hong Kong the sampling period required by Env. Dept is on 8-hour basis with... Last reply: Allison Beer McKenzie, Jul 22, 2010, 8:13 am |
|
BAS- Lighitng Control for Hotel SpacesEBOM-2009 EAc3.1: Performance measurement - building automation systemposted by Ashu Gupta on Jul 13, 2010, 6:12 am
Is it necessary to integrate the entire lighting to BMS such as Hotel lobby lighting, corridor lighting which is always ON (24*7)? Also should guest rooms lighting integrate to BMS or not... Last reply: Pierce Holstrom, Jul 21, 2010, 6:17 pm |
|
Renewable Energy to improve EfficiencyEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Heidi Creighton on Jun 17, 2010, 12:19 pm
If I have a PV system to offset the building energy use can I use it to show performance over 19% to meet the prerequisite (like in NC) or does the building efficiency stand alone to show 19%... Last reply: Jenny Carney, Jul 21, 2010, 2:45 pm |
|
Rated PowerCI-2009 EAc1.4: Optimize energy performance - equipment and appliancesposted by kelvin duen on Jul 20, 2010, 3:13 pm
I'm having a little confusion as to what "... Last reply: Paul Conrad, Jul 20, 2010, 3:44 pm |
|
Process Load-Can I call my computer room units a process load?NC-2009 EAc1: Optimize Energy Performanceposted by John Harrington on Jul 16, 2010, 1:45 pm
I have a Liebert Computer Room Unit (DX System) it has a capacity of 137.8 MBH. It has a low efficiency (8.2 EER), the min efficiency listed on the 90/1-2007 TABLE 6.8.1B is 10.6 EER.... Last reply: Christopher Schaffner, Jul 19, 2010, 8:50 pm |
|
TENANT SPACE ENERGY MODELINGCS-2009 EAc1: Optimize Energy Performanceposted by javier bolanos zeledon on Jun 29, 2010, 11:19 am
I'm modeling a CS office building, but have no tenants yet. It is my understanding that I have to provide tenant HVAC equipment as per baseline building requirements to the design building, in... Last reply: Christopher Schaffner, Jul 19, 2010, 8:45 pm |
|
ASHRAE- LPD limitsNC-2009 EAp2: Minimum Energy Performanceposted by Rosana Correa on Jul 16, 2010, 4:29 pm
In one of our projects, we have closed large areas with ceiling height of 95 ft. It is very difficult to illuminate these environments properly according to the boundaries of ASHRAE. The... Last reply: Christopher Schaffner, Jul 19, 2010, 8:40 pm |
|
Providing Bike Lanes for SchoolsSchools-2009 SSc4.2: Alternative transportation - bicycle storage and changing roomsposted by Maya Karkour on Jul 13, 2010, 11:04 am
Hi all, We are working on a school where the bike racks will be installed in the first basement level just next to the ramp. That same ramp will be very close to the site entrance.... Last reply: Tristan Roberts, Jul 19, 2010, 6:22 pm |