Topic | Recent |
---|---|
Fan Coil UnitsEBOM-2009 EAc3.1: Performance measurement - building automation systemposted by Ashu Gupta on Jul 26, 2010, 12:53 am
We have 500 Fan coil units in our project but they are not on BMS. Chiller, boiler, AHUs and other HVAC units are on BMS. So my question is should we integrate the FCUs on BMS to achieve this... Last reply: Pierce Holstrom, Jul 30, 2010, 11:10 am |
|
Is a single meter reading for a campus acceptable?EBOM-2009 EAc1: Optimize Energy Efficiency Performanceposted by Yong Lee Low on Jul 29, 2010, 11:46 pm
If the project is a 3 building campus,and I split the space types into 6-7 categories but my meter reading is just from a single feeding point i.e. just 1 meter for the entire campus ,will that... |
|
Discrepancy between Reference Manual and TemplateCI-2009 EAc1.2: Optimize energy performance - lighting controlsposted by Amy Rider on Jul 26, 2010, 5:25 pm
I am seeing a discrepancy between the LEED template and the IDC reference manual for EAc1.2. Last reply: Amy Rider, Jul 28, 2010, 4:09 pm |
|
ExceptionsNC-2009 IEQc8.1: Daylight and views - daylightposted by Lauren Sparandara on Feb 4, 2010, 3:19 pm
Hello. What rooms exceptions have folks successfully passed? For instance, the hospital project I am working does not have daylight or views in some of its operating rooms, imaging rooms and exam... Last reply: Anne Nicklin, Jul 28, 2010, 2:43 pm |
|
LEED ID&C EA 1.3- 5 or 10 points for RP?CI-2009 RPc1: Regional Priorityposted by Abena Darden on Jul 28, 2010, 1:39 pm
In my project's zip code (94128), for LEED ID&C, EA 1.3 is listed as one of the RP credits. However, in ID&C there are two options for EA 1.3-- doing either gets 5 points, doing both... Last reply: Tristan Roberts, Jul 28, 2010, 1:43 pm |
|
DES vs purchased heat for 1! buildingNC-2009 EAc1: Optimize Energy Performanceposted by Nicolas Galiotto on Jul 26, 2010, 9:52 am
Hi Christopher, hi everybody, I've juste seen the two first posts on this page but it does not help. We are purchasing heat from a district heating plant (100% green). The USGBC's... Last reply: Christopher Schaffner, Jul 28, 2010, 8:38 am |
|
thoughts on the 5-year termination clause issueCI-2009 MRc1.1: Tenant space - long-term commitmentposted by Cara Mae Cirignano on Jul 27, 2010, 5:13 pm
Hi Kathy - Last reply: Philip Herriges, Jul 28, 2010, 8:13 am |
|
Multi-Residential building with less than 10% of retail areaCS-2009 WEp1: Water Use Reductionposted by MARIA GARCIA on Jul 14, 2010, 4:06 am
I am working on a multi-residential building with less than 10% of gross retail area in the ground floor. The project is under LEED CS and the owner will provide all fixtures for the multi-... Last reply: Karen Blust, Jul 28, 2010, 1:38 am |
|
Telecommuting & Energy StarEBOM-2009 SSc4: Alternative Commuting Transportationposted by Cody Gale on Jul 14, 2010, 6:31 pm
If our strategy for this credit involves mandating telecommuting for every employee once a week, which will reduce commuting trips by 20%, will we be required to adjust our Energy Star inputs (... Last reply: Dan Ackerstein, Jul 28, 2010, 12:13 am |
|
Spaces to include in this creditEBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Matthew Macko on Jul 20, 2010, 1:50 pm
I am working on a project that has a main 40 story office building with a retail plaza surrounding it. The site area includes the retail plaza, but does this mean that we have to test all the... Last reply: Dan Ackerstein, Jul 28, 2010, 12:01 am |