EAc2.1- ASHRAE RouteEBOM-2009 EAc2.1: Existing building commissioning - investigation and analysisposted by Miriam Gee on May 19, 2010, 7:19 pm
Hi LEED users.... wondering if our... Last reply: Jenny Carney, May 19, 2010, 7:23 pm |
|
LEED only requires a Contract to be inplace for 10 Month ReviewNC-2009 EAc3: Enhanced Commissioningposted by Jean Marais on May 19, 2010, 4:14 am
The way I read this is that LEED only requires a contract to be in place for the 10 Month Review. The contract must include in its scope: 1) One 10 Month Review Plan which will incorporate... |
|
1/4 radius vs walking distanceNC-2009 SSc4.1: Alternative transportation - public transportation accessposted by Annette Bellafiore on May 18, 2010, 6:59 pm
The language seems a little confusing whether the bus stops need to be within 1/4 mile... Last reply: Dave Intner, May 18, 2010, 8:17 pm |
|
Template questionsEBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Vanessa Seibert on May 12, 2010, 5:33 pm
Besides the fact that I find this template absolutely confussing I'm totally thrown by the Flow Rate chart. Under lavatories it compares what you've got against the baseline of 0.5 gpm/gpc... Last reply: Jason Franken, May 17, 2010, 11:25 am |
|
Using rainwater for toiletsEBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Oscar Enguita on May 17, 2010, 10:37 am
Is not possible to demostrate a water reduction in this credit if the building collects water from rain and reuses it for the toilets? In my case, the gallons per flush of potable water is zero... Last reply: Jason Franken, May 17, 2010, 11:10 am |
|
Water use in a luxury hotelNC-2009 WEp1: Water Use Reductionposted by Josephine de Montmarin on May 12, 2010, 8:28 am
LEED asks that the baseline and projected water use be evaluated at 60 and 80psi. How can we account for the fact that the pressure won't be that high? Th project is a luxury hotel, which... Last reply: Josephine de Montmarin, May 17, 2010, 9:38 am |
|
Parking Garages- RoofsNC-2009 SSc7.1: Heat island effect - nonroofposted by V. Miller on May 17, 2010, 4:16 am
I am working on a project where the underground parking garage extends further than the building footprint, under the adjoining pavements and road ways. Do these pavements and road ways have to... Last reply: Jean Marais, May 17, 2010, 7:11 am |
|
SRI test for concrete required for LEED 2009?NC-2009 SSc7.1: Heat island effect - nonroofposted by Alison Y Rivenburgh on May 10, 2010, 10:41 am
The language for LEED 2009 differs from past versions - it seems to indicate that it won't just accept the default... Last reply: Jean Marais, May 17, 2010, 12:30 am |
|
EBOM IEQp1EBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Kim Sosalla-Bahr on Apr 25, 2010, 4:43 pm
I am working with a facility to determine if they can meet the prerequisites for LEED... Last reply: Corinna Kester, May 17, 2010, 12:12 am |
|
Flush-out QuestionNC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Leandro Silva on May 14, 2010, 8:34 am
We are completing a three-story story "vestiário" (shower and locker room) building in Rio de Janeiro, Brazil and have a question relative to EQc3.2. This building is naturally ventilated and to... Last reply: Tristan Roberts, May 16, 2010, 10:56 pm |