Topic | Recent |
---|---|
A Unique Situation for an AdditionNC-2009 SSc7.1: Heat island effect - nonroofposted by Michael Kros on Jul 22, 2010, 2:27 pm
We are working on getting an addition certified under version 3.0 that is being added onto an original... Last reply: Michael Kros, Jul 23, 2010, 3:13 pm |
|
E1 E0 woodCI-2009 IEQc4.4: Low-emitting materials - composite wood and agrifiber productsposted by Vivian Wan on Jul 23, 2010, 4:01 am
do you know whether E1 and E0... Last reply: Tristan Roberts, Jul 23, 2010, 11:00 am |
|
Should I consider in this Prerequisite also the Restrooms?NC-2009 IEQp1: Minimum indoor air quality performanceposted by Claudia Rieger on Jul 8, 2010, 2:07 pm
Hi everybody, Now, let´s go to the question, I have a single... Last reply: Carrie Lai, Jul 22, 2010, 10:43 pm |
|
Rated PowerCI-2009 EAc1.4: Optimize energy performance - equipment and appliancesposted by Victoria Lockhart on May 18, 2010, 9:48 am
not sure if im understanding the Reference Guide correctly: for the calculation do we use the default values for... Last reply: Paul Conrad, Jul 22, 2010, 11:17 am |
|
Air Testing CriteriaNC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Vivian Wan on Jul 22, 2010, 2:29 am
Is there any guideline to the sampling criteria such as the measurement interval during the normal occupied hours? In Hong Kong the sampling period required by Env. Dept is on 8-hour basis with... Last reply: Allison Beer McKenzie, Jul 22, 2010, 8:13 am |
|
BAS- Lighitng Control for Hotel SpacesEBOM-2009 EAc3.1: Performance measurement - building automation systemposted by Ashu Gupta on Jul 13, 2010, 6:12 am
Is it necessary to integrate the entire lighting to BMS such as Hotel lobby lighting, corridor lighting which is always ON (24*7)? Also should guest rooms lighting integrate to BMS or not... Last reply: Pierce Holstrom, Jul 21, 2010, 6:17 pm |
|
Renewable Energy to improve EfficiencyEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Heidi Creighton on Jun 17, 2010, 12:19 pm
If I have a PV system to offset the building energy use can I use it to show performance over 19% to meet the prerequisite (like in NC) or does the building efficiency stand alone to show 19%... Last reply: Jenny Carney, Jul 21, 2010, 2:45 pm |
|
Rated PowerCI-2009 EAc1.4: Optimize energy performance - equipment and appliancesposted by kelvin duen on Jul 20, 2010, 3:13 pm
I'm having a little confusion as to what "... Last reply: Paul Conrad, Jul 20, 2010, 3:44 pm |
|
Process Load-Can I call my computer room units a process load?NC-2009 EAc1: Optimize Energy Performanceposted by John Harrington on Jul 16, 2010, 1:45 pm
I have a Liebert Computer Room Unit (DX System) it has a capacity of 137.8 MBH. It has a low efficiency (8.2 EER), the min efficiency listed on the 90/1-2007 TABLE 6.8.1B is 10.6 EER.... Last reply: Christopher Schaffner, Jul 19, 2010, 8:50 pm |
|
TENANT SPACE ENERGY MODELINGCS-2009 EAc1: Optimize Energy Performanceposted by javier bolanos zeledon on Jun 29, 2010, 11:19 am
I'm modeling a CS office building, but have no tenants yet. It is my understanding that I have to provide tenant HVAC equipment as per baseline building requirements to the design building, in... Last reply: Christopher Schaffner, Jul 19, 2010, 8:45 pm |