Log in
Forum » Credit Forums
Topic

A Unique Situation for an Addition

NC-2009 SSc7.1: Heat island effect - nonroof
posted by Michael Kros on Jul 22, 2010, 2:27 pm

We are working on getting an addition certified under version 3.0 that is being added onto an original...

Last reply: Michael Kros, Jul 23, 2010, 3:13 pm

E1 E0 wood

CI-2009 IEQc4.4: Low-emitting materials - composite wood and agrifiber products
posted by Vivian Wan on Jul 23, 2010, 4:01 am

do you know whether E1 and E0...

Last reply: Tristan Roberts, Jul 23, 2010, 11:00 am

Should I consider in this Prerequisite also the Restrooms?

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Claudia Rieger on Jul 8, 2010, 2:07 pm

Hi everybody,
from the precedent thread I understood that when I have a 100% OA system and multizone, I have to use Ev=1.

Now, let´s go to the question, I have a single...

Last reply: Carrie Lai, Jul 22, 2010, 10:43 pm

Rated Power

CI-2009 EAc1.4: Optimize energy performance - equipment and appliances
posted by Victoria Lockhart on May 18, 2010, 9:48 am

not sure if im understanding the Reference Guide correctly: for the calculation do we use the default values for...

Last reply: Paul Conrad, Jul 22, 2010, 11:17 am

Air Testing Criteria

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Vivian Wan on Jul 22, 2010, 2:29 am

Is there any guideline to the sampling criteria such as the measurement interval during the normal occupied hours? In Hong Kong the sampling period required by Env. Dept is on 8-hour basis with...

Last reply: Allison Beer McKenzie, Jul 22, 2010, 8:13 am

BAS- Lighitng Control for Hotel Spaces

EBOM-2009 EAc3.1: Performance measurement - building automation system
posted by Ashu Gupta on Jul 13, 2010, 6:12 am

Is it necessary to integrate the entire lighting to BMS such as Hotel lobby lighting, corridor lighting which is always ON (24*7)?

Also should guest rooms lighting integrate to BMS or not...

Last reply: Pierce Holstrom, Jul 21, 2010, 6:17 pm

Renewable Energy to improve Efficiency

EBOM-2009 EAp2: Minimum Energy Efficiency Performance
posted by Heidi Creighton on Jun 17, 2010, 12:19 pm

If I have a PV system to offset the building energy use can I use it to show performance over 19% to meet the prerequisite (like in NC) or does the building efficiency stand alone to show 19%...

Last reply: Jenny Carney, Jul 21, 2010, 2:45 pm

Rated Power

CI-2009 EAc1.4: Optimize energy performance - equipment and appliances
posted by kelvin duen on Jul 20, 2010, 3:13 pm

I'm having a little confusion as to what "...

Last reply: Paul Conrad, Jul 20, 2010, 3:44 pm

Process Load-Can I call my computer room units a process load?

NC-2009 EAc1: Optimize Energy Performance
posted by John Harrington on Jul 16, 2010, 1:45 pm

I have a Liebert Computer Room Unit (DX System) it has a capacity of 137.8 MBH.

It has a low efficiency (8.2 EER), the min efficiency listed on the 90/1-2007 TABLE 6.8.1B is 10.6 EER....

Last reply: Christopher Schaffner, Jul 19, 2010, 8:50 pm

TENANT SPACE ENERGY MODELING

CS-2009 EAc1: Optimize Energy Performance
posted by javier bolanos zeledon on Jun 29, 2010, 11:19 am

I'm modeling a CS office building, but have no tenants yet. It is my understanding that I have to provide tenant HVAC equipment as per baseline building requirements to the design building, in...

Last reply: Christopher Schaffner, Jul 19, 2010, 8:45 pm