ESC Plan and CAPP Plan for Sloped SiteNC-2009 SSp1: Construction Activity Pollution Preventionposted by Arub Vijay on Nov 8, 2011, 8:20 am
We have a Hotel project which will be constructed on a mountain with the whole site having a slope towards west. The 8 storied building is flush with the mountain such that only one or two sides... Last reply: Steve Loppnow, Dec 15, 2011, 6:35 pm |
|
Late implementation due to temporary cancelation of projectNC-2009 SSp1: Construction Activity Pollution Preventionposted by Daniela Castro Salgado on Nov 15, 2011, 5:34 pm
Hi everyone! Here's a tricky one... Last reply: Steve Loppnow, Dec 15, 2011, 6:27 pm |
|
stolen materials from dumpstersCI-2009 MRc2: Construction Waste Managementposted by Philip Herriges on Aug 23, 2010, 6:09 pm
Our project is located in a nearby suburb of a very economically depressed city. It is not uncommon to have copper stripped from live transformers and stolen from construction trailers... Last reply: Jennifer Berthelot-Jelovic, Dec 15, 2011, 5:40 pm |
|
Interior Lighting for 24 operationNC-2009 SSc8: Light Pollution Reductionposted by Erin Holdenried on Dec 15, 2011, 4:04 pm
Can compliance with the following requirement also be documented by proving (through interior lighting contour drawings) that less than 10% or the initial fixture lumens will be transmitted... |
|
Combination of Steep-Slope and Low-Slope RoofNC-2009 SSc7.2: Heat island effect - roofposted by Tysa Tenebro on Apr 20, 2010, 8:56 am
We have a project that have steep-slope and low-slope roofs. What are the requirements for this credit SSc7.2? Am I going to follow with the low-slope:... Last reply: Yetsuh Frank, Dec 15, 2011, 3:31 pm |
|
emergency exterior lightingNC-2009 SSc8: Light Pollution Reductionposted by Iris Amdur on Dec 15, 2011, 2:58 pm
Are there any circumstances where emergency exterior lighting would be exempt from credit requirements? |
|
Permeable Paving- "vegetated open space"NC-2009 SSc5.2: Site development - maximize open spaceposted by Lauren Sparandara on Mar 21, 2011, 3:50 pm
If our permeable paving has grass growing through it could that count as both hardscape for SSc7.1 and for vegetated open space in SSc5.2? We aren't achieving SSc2 so we cannot technically... Last reply: Manny Iglesia, Dec 15, 2011, 2:17 pm |
|
Definition of Site Area?NC-2009 SSc5.2: Site development - maximize open spaceposted by Ellen Mitchell on Apr 11, 2011, 4:06 pm
This may be a dumb question, but I have a project that falls under Case 3 - provide vegetated open space equal to 20% of the project's site area. I can't find any credit language that says... Last reply: Manny Iglesia, Dec 15, 2011, 2:08 pm |
|
Reflecting PoolNC-2009 SSc5.2: Site development - maximize open spaceposted by Rosana Correa on May 9, 2011, 2:08 pm
Hello everyone! Will areas covered with reflecting pools count as open space areas? Thanks! Last reply: Manny Iglesia, Dec 15, 2011, 1:56 pm |
|
Commercial Kitchen hand washing sinksCI-2009 WEc1: Water Use Reductionposted by ANDREW MOISEEV on Dec 15, 2011, 11:56 am
Are the hand wash sinks included in the 20% reduction requirement? Last reply: Seema Pandya, Dec 15, 2011, 12:05 pm |