Log in
Forum » Credit Forums
Topic

definition of "bus line" vs. "bus stop"

CI-2009 SSc3.1: Alternative transportation - public transportation access
posted by Philip Herriges on Aug 23, 2010, 5:45 pm

I'm not sure that the graphic above for this credit for option #2 is correct. The credit reads for option 2: "Locate the project within 1/4 mile...

Last reply: Simon Sue, Aug 25, 2010, 9:14 pm

Space Usage Types

EBOM-2009 SSc1: LEED Certified Design and Construction
posted by Steve Offutt on Aug 11, 2010, 4:01 pm

I also wasn't sure where to ask this question. It might be worthwhile to have a general...

Last reply: Jenny Carney, Aug 25, 2010, 6:19 pm

Strategies to filter TSS

NC-2009 SSc6.2: Stormwater design - quality control
posted by Habitech Distretto Tecnologico Trentino on Jul 30, 2010, 3:48 am

The project is located in Italy and the project team is able to treat the 90 % of the average annual rainfall using some systems in series. The water comes from the roofs and all the hardscape in...

Last reply: Amy Rider, Aug 25, 2010, 1:59 pm

Stormwater cistern

NC-2009 SSc6.2: Stormwater design - quality control
posted by Jana Schulz on Jul 21, 2010, 1:14 pm

This is a project located in previously developed urban area. We have a cistern capable of receiving 100% of the site's runoff, however, only a small amount of this water will be reused in...

Last reply: Amy Rider, Aug 25, 2010, 1:52 pm

Re: Controllability Through a Web-based Interface and the BMS

NC-2009 IEQc6.2: Controllability of systems - thermal comfort
posted by James Del Monaco on Aug 25, 2010, 10:54 am

I understand the typical methods for achieving this credit, i.e., underfloor air, etc. And I have documented this on other project (under NC v2.2). But I have a project where the approach may...

Last reply: Lauren Sparandara, Aug 25, 2010, 1:15 pm

Non-occupied Spaces

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by James Del Monaco on Aug 24, 2010, 6:42 pm

I'm working on a TI project where the tenant occupies 2 floors of an 8-story office building. I have an overhead...

Last reply: Paul Conrad, Aug 25, 2010, 9:55 am

M&V Plan- Questions

CS-2009 EAc5.1: Measurement and verification - base building
posted by Maya Karkour on Aug 25, 2010, 6:06 am

Dear all,

I am attempting LEED 2009 CS, EA Cr 5.1 & Cr 5.2.

My project is 4 multi-storey commercial buildings, whereby a different tenant occupies each floor of a building....

Last reply: Christopher Schaffner, Aug 25, 2010, 9:36 am

Energy Star and Energy & Water Data Release Form

EBOM-2009 EAc1: Optimize Energy Efficiency Performance
posted by Pablo Fortunato Suarez on Aug 9, 2010, 4:35 am

1) if a project obtains a score of 96 in Energy Star, this counts as 18 points?
2) where do we upload the accomplished Energy and Water Data Release Form?

Last reply: Pablo Fortunato Suarez, Aug 24, 2010, 10:59 pm

Interior Lighting- University Resident Housing

NC-2009 SSc8: Light Pollution Reduction
posted by Cynthia Estrada on Aug 24, 2010, 5:03 pm

Does anyone have experience with a campus dorm application for Interior Building Lighting - Option 2? I don't think the campus wants to pay for automatic shades for all the resident rooms, much...

Concrete Curing Systems

NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Tim Rogers on Aug 24, 2010, 11:19 am

We have an issue where a concrete curing application is being used on the concrete BEFORE the weatherproofing system is in place, and before the building is closed-in. As a wet product, the VOCs...

Last reply: Mara Baum, Aug 24, 2010, 11:52 am